r <br />additional insured. <br />"All Risk" Property Insurance covering all of the Contractor's equipment used to perform <br />the Work. A waiver of subrogation against Amtrak is also to be included. <br />Builder's Risk Insurance providing All Risk coverage on a Completed Value basis, <br />including labor and materials (in place, on site, in storage off-site or in transit). <br />Contractor (and subcontractors) and Amtrak are to be named as Loss Payee, with respect <br />to their interests in the covered property. <br />Railroad Protective Liability Insurance (current ISO Form) with Amtrak as the named <br />insured on the policy. Limits of liability shall be Two Million Dollars (52,000,000) per <br />occurrence, combined single limit and Six Million Dollars ($6,000,000) annual <br />aggregate. Policy Endorsement CG 28 31-Pollution Exclusion Amendment is also to be <br />included. <br />A Certificate of Insurance evidencing the above coverages and the original Railroad <br />Protective Policy is required prior to the start of any Work. The City will cause its contractor <br />and any subcontractors to include Amtrak as an additional insured in any insurance policies <br />required by the City in its contracts for the Work. <br />8. In connection with the renovation of the Station, the City shall obtain local site and building <br />plan approvals and final building inspections. Upon completion of renovation, the City shall <br />obtain a certification from the architect of the renovation project that the Work was <br />constructed in conformity with all the Construction Documents. Upon receipt of such <br />certification, the City warrants that the Station shall be in full compliance with aU applicable <br />laws, ordinances and regulations, including without limitation all applicable building codes, <br />caning, environmental and requirements of the American with Disabilities Act of 1990, as <br />amended (the "ADA"). Notwithstanding the foregoing, the City shall remain liable for the <br />cost or repair or corrections of items of Work to the Station subsequently determined not to <br />have been constructed in accordance with applicable laws, ordinances, regulations caning or <br />building code requirements in effect at the tune of permit issuance. The City also shall <br />fiunish to Amtrak, at the City's sole cost and expense, a copy of tbe architect's certifiication <br />and as built drawings and electronic files (auto cad format) of the Station, within seven (?) <br />days of substantial completion of the Work. <br />9. Amtrak will contnbute to the City up to the full amount of Amtrak's Contribution for the <br />design and renovation of tbe Station as follows: <br />A) An amount not to exceed Two Hundred Fifty Thousand Dollars ($250,000) toward the <br />design plans for the renovation of the Station. After Amtrak's receipt, review and <br />approval of the design plans for the Station, the City will submit a detailed invoice for <br />the design costs. Amtrak will pay to the City any undisputed amount up to the <br />maximum $250,000 within thirty (30) days after Amtrak's receipt of the City's <br />invoice. If Amtrak disputes any portion of the invoice, Amtrak will promptly notify <br />the City of the amount in dispute and the reason therefore. Amtrak and the City shall <br />negotiate in good faith to resolve any such dispute. If the parties are unable to resolve <br />the dispute after sixty (60) days, Amtrak shall make the final decision. <br />B) An amount not to exceed the balance remaining of Amtrak's Contribution (after any <br />payment by Amtrak pursuant to Section 9A above) toward the construction costs for <br />the Work. Upon Substantial Completion, the City will submit an invoice for <br />construction costs of the Work. Amtrak will pay to the City any undisputed amount <br />up to the maximum balance remaining from Amtrak's Contribution within thirty (30) <br />days after receipt of the City's invoice. If Amtrak disputes any portion of the invoice, <br />Amtrak will promptly notify the City of the amount in dispute and the reason <br />