CITY OFEUGENE -LOWER AMAZON FEMA STUDY <br /> URS Corporation Project #52-945042ND.07 <br /> Eugene Design Task <br /> Project Manager: John HolroydlBinhong Wu <br /> P~~gress Report 12 <br /> Per~o~ beginning February 3, 2001and ending March 2, 2001 <br /> i <br /> "I. Budget Status Total Previous Expenditures: $22,159 <br /> Total Current Invoice: $3,127 <br /> Total Billed: $25,286 <br /> Contract Amount: $59,540 <br /> I~. Project Work . Prepared a summary of project status and budget information for each task based <br /> Completed on the conversations with the City. <br /> • Reviewed aerial photos and contour information provided by the City. <br /> • Started preparing maps that will be used for developing overbank topographic for <br /> surveyed cross sections on A Channel and Diversion Channel downstream of <br /> Royal Avenue. <br /> • Reviewed the HEC-1 model developed by the Corps for the 1135 project. <br /> III. Work to be • Work with the City to develop overbank topographic for surveyed channel cross <br /> Completed during sections on the Diversion Channel and A Channel. <br /> the Next Period • Work with the Corps to develop updated cross section information based on the <br /> 1135 as-builts. <br /> • Update the HEC-1 model developed by the Corps to generate the required flow <br /> hydrographs to be used in the hydraulic analysis. <br /> IV. Outstanding The sub-basin delineation maps used to develop the HEC-1 model for the <br /> Requests for Amazon Basin by OTAK in 1990. <br /> Information <br /> <br /> 1:~945042ND~.4MAZONFEMA~PROJECTMANAGEMENT~PRI2.DOC 03-1 S-O 1 <br /> <br />