ti CITY OFEUGENE -LOWER AMAZON FEMA STUDY <br /> URS Corporation Project #52-945042ND.07 <br /> Eugene Design Task <br /> <br /> rrProject Manager: Binhong Wu <br /> Progress Report 15 <br /> Period beginning May 5, 2001 and ending June 1, 2001 <br /> I. Budget Status Total Previous Expenditures: $50,679 <br /> Total Current Invoice: $2,281 <br /> Total Billed: $52,960 <br /> Contract Amount: $59,540 <br /> I[. Project Work • Finalized the preliminary hydraulic analysis based on the updated UNET model <br /> Completed results. <br /> • Wrote a memo to summarize the preliminary hydraulic results. <br /> • Held a conference call with the City to discuss the results with the City. <br /> • Helped the City to draft a letter to the Corps requesting 11351evee certification <br /> document. <br /> III. Work to be • Finalize the contract addendum and budget information. <br /> Completed during • Work with the City to determine whether floodway analysis is needed for the <br /> the Next Period Lower Amazon Creek. <br /> • Based on the City's decision, prepare and start the hydraulic analysis for the next <br /> phase. <br /> IV. Outstanding The sub-basin delineation maps used to develop the HEC-1 model for the <br /> Requests for Amazon Basin by OTAK in 1990. <br /> Information <br /> \\POR2\PROJ-WC\945042NDWMAZONFEMA\PROJECTMANAGEMENT~PRI S.DOC 06-20-01 <br /> <br />