6J8/20u4 12:55 PM 2 of 4 - <br /> PROJECT: Lower Amazon Floodplain Mapping Project - Ph2 PROJ QC PRIN PROD PROJ E.1.T. STAFF <br /> DATE: OS~Jun-2004 MGR ENG ENG ENG ENG CLER. TOTAL PROJECT <br /> JOB No: 1103 $145.00 $130.00 $133.00 $90.00 $87.00 $60.00 $56.00 HRS COST <br /> TASK 4 -TOPOGRAPHIC DATA DEVELOPMENT <br /> 1 Obtain ~ Review Survey, Mapping Data, T1N and <br /> _ Certifications Y 3 16 19 $1,875.00 <br /> 2 Prepare the Base Map, Topographic Data <br /> Develo ment and Ground Surve Submittal 1 1 12 4 1 19 $1,651.00 <br /> LABOR SUBTOTAL 4 1 0 28 0 4 1 38 $3,526.00 <br /> EXPENSES (Including Subs) $100.00 <br /> TOTAL TASK 4 -TOPOGRAPHIC DATA DEVELOPMENT $3,626.00 <br /> TASK 5 -HYDROLOGIC ANALYSES <br /> 1 Develo the 500- ear 24-hour Rainfall Event 1 2 3 $304.00 <br /> _ 2 Tabulate the 72-Hour Rainfall Event 1 4 5 $478.00 <br /> 3 Pre are a Historic Rainfall Event -Feb '96 1 4 S $478.00 <br /> 4 Pre are Letter Re ort for New Storm Distributions 1 1 6 4 12 $1,021.00 <br /> 5 Execute XP~WMM Model and Format Output for <br /> RAS Unstead 1 1 26 28 $2,537.00 <br /> 6 Develop HEC-HMS models for Unmodeled <br /> Contributing Areas 4 4 16 6 30 $2,828.00 <br /> 7 Document H drolo is Anal sis 6 3 32 9 50 $4,548.00 <br /> 8 Pre are FEMA H drolo is Submittal 1 1 16 18 $1,667.00 <br /> LABOR SUBTOTAL 13 13 0 0 106 0 19 151 $13,861.00 <br /> EXPENSES (including Subs) $50.00 <br /> TOTAL TASK 5 -HYDROLOGIC ANALYSES $13,911.00 <br /> TASK 6 -HYDRAULIC ANALYSES <br /> <br /> _ 1 Create FIS H draulic Model ~ 4 3 6 64 ~ 32 ~ 109 $9,448.00 <br /> 2 Model FIS Floodwa 1 4 40 45 $4,157.00 <br /> 3 Pre are H draulic Submittal 2 2 16 8 28 $2,438.00 <br /> LABOR SUBTOTAL 7 5 10 80 40 32 8 182 $16,043.00 <br /> EXPENSES (including Subs) $100.00 <br /> TOTAL TASK 6 -HYDRAULIC ANALYSES $16,143.00 <br /> RC Phifa Rev Lower Amazon_Floodplain_Mappin~Reduced_Cost Option.zVs <br /> ~I <br /> I <br /> <br />