4!10/2006 8:23 AM 1 of 1 <br /> PROJECT: Lower Amazon Floodplain Mapping Project Phase 2b PRIN SNR CAD <br /> DATE: 10-Apr-2006 ENG ENG ENG ADMIN TOTAL PROJECT <br /> JOB No:1153 $155.00 $120.00 $105.00 $65.00 HRS COST <br /> SURVEY AND MAPPING SUBMITTAL <br /> 1 Administration and Corres ndence 4 4 8 $740.00 <br /> LABOR SUBTOTAL 0 4 0 4 8 $740.00 <br /> EXPENSES (Including Subs) $0•~ <br /> TOTAL SURVEY AND MAPPING SUBMITTAL $740.00 <br /> PROJECT: Lower Amazon Floodplain Mapping Project Phase 2b PRIN SNR CAD <br /> DATE: 10-Apr-2006 ENG ENG ENG ADMIN TOTAL PROJECT <br /> JOB No:1153 $155.00 $120.00 $105.00 $65.00 HRS COST <br /> FLOODPLAIN AND FLOODWAY MAPPING <br /> 1 Plot Flood Profiles 4 4 8 $900.00 <br /> 2 Ma Flood lain Boundaries 5 6 11 $1,495.00 <br /> 3 Tabulate Floodwa Widths 2 4 6 $500.00 <br /> 4 Ma Fbodwa Boundaries 4 2 6 $860.00 <br /> 5 Com ete FIS Work Ma 5 6 11 $1,495.00 <br /> 6 Check Internal Consisten 5 4 9 $1 255.00 <br /> LABOR SUBTOTAL 19 24 4 4 51 $6,505.00 <br /> EXPENSES (Including Subs) <br /> TOTAL FLOODPLAIN AND FLOODWAY MAPPING $6 505.00 <br /> FEMA FIS SUBMITTAL <br /> 1 Create GIS Di ital Flood Cove e: 8 8 24 40 $4,720.00 <br /> 2 Pre re FIS Re 6 16 6 28 $3,240.00 <br /> 3 Pre re TSDN 2 8 16 26 $2 310.00 <br /> LABOR SUBTOTAL 16 32 24 22 94 $10,270.00 <br /> EXPENSES (Including Subs) $100.00 <br /> TOTAL FEMA FIS SUBMITTAL $10 370.00 <br /> POST PRELIMINARY PROCESSING <br /> 1 Res nd to FEMA's Review 8 8 16 $2 200.00 <br /> 2 FEMA Public Meeti 8 8 16 $2,200.00 <br /> 3 Res nd to FEMA Review Comments 8 8 16 $1 480.00 <br /> LABOR SUBTOTAL 16 24 0 8 48 $5,880.00 <br /> EXPENSES (Including Subs) $100.00 <br /> <br /> TOTAL POST PRELIMINARY PROCESSING $5 980.00 <br /> PROJECT SUMMARY <br /> SURVEY AND MAPPING SUBMITTAL. 0 4 0 4 8 $740.00 <br /> 1 FLOODPLAIN AND FLOODWAY MAPPING 19 24 4 4 51 $6 505.00 . <br /> 2 FEMA FIS SUBMITTAL 16 32 24 22 94 $10,270.00 <br /> 3 POST PRELIMINARY PROCESSING 16 24 0 8 48 $5 880.00 <br /> LABOR TOTAL 51 80 28 34 193 $23,395.00 <br /> <br /> TOTAL EXPENSES $1,~•~ <br /> <br /> GRAND TOTAL ~ $24 395.00 <br /> WATER ttE541JRG~S, fNG. <br /> Fee Estimate Phase 2b.xis <br /> <br />