CITY OF EUGENE
<br />DEPARTMENT OF PUBLIC WORKS
<br />ENGINEERING DIVISION
<br />Change Order Job# 3693
<br /> Contract # 2007-02
<br />CONTRACTOR: Delta Construction Co. Change Ober # 7
<br />(ADDRESS) 999 Division Avenue Date: 12!21107
<br />Eugene OR 97404 CAMS Date:
<br /> Reviewed b . Date:
<br />PROJECT: Paving, curbs, gutters, sidewalks, street lights, water quality bioawales, Inspector. Rav emmere
<br />and atormweter drainage on River Avenue from 200' east of River Road to Conet. M r. Kds Olson
<br />100' west of BelOine Highway Proi. Mgr. Joe Ramirez
<br /> PdnGpal Eng. Michelle Cahi ~~_
<br />Contract Contract
<br />Item
<br />No.
<br />Item Time
<br />Chan a Quantity
<br />Units Unit
<br />Cost
<br />Amount
<br />+!-) Amended
<br />Change Net
<br />Change
<br />431 Remove 8 replace ADA ramp wing, sidewalk Orl Ina! 0.00 0.00 .00 ;O,OD
<br /> panel. Install curb. Revised 0.00 0.00 0.00
<br /> Amended 1.00 L,S. 995.14 995.14 995.14
<br />432 Additional 8- concrete Ori anal 0.00 0.00 0.00 ;0.00
<br /> Revised 0.00 0.00 .00
<br /> Amended 1.00 LS. 1969.01 1968.01 1968.01
<br />491 Additional Loam at 409 River Ave Ori Ina! 0.00 p,g0 O,gg $0 ~
<br /> Revised 0.00 .00 0,00
<br /> Amended 1.00 L.S. ;393.85 393.85 393.85
<br /> Ort Ina! 0.00 0.00 0.00 x.00
<br /> Revised 0.00 0.00 0.00
<br /> Amended 1.00 L.S. 0.00 .00 ;0,00
<br /> Od Ina! 0.00 0.00 0.00 ;O,Op
<br /> Revised 0.00 0.00 0.00
<br /> Amended 1.00 L.S. ;0.00 0.00 0.00
<br /> 0 anal 0.00 0.00 0.00 >t0.~
<br /> Revised 0.00 D.00 0.00
<br /> Amended 1.00 L.S. ;0.00 0.00 0.00
<br />The original contract work days are O.D da
<br />The contract time change this C.O 39.o da
<br />The contract time change by previous C.O.'s a3.o da s
<br />The new contract work da s are 82.o da s
<br />The original contract sum was
<br />Net change by previous change order
<br />Net change due to amendment by previous change order
<br />The contract sum prior to this change order was .,.,_,
<br />This change order will change contract sum by this amount ,,,,,_, .
<br />The new contract net change sum
<br />The new contract amendment sum
<br />.__........_.._ .................___.___................._...__._._..._......__.___...._..___M..._..__.._.___....._....__..
<br />The new contract sum including this change order will be , ___~„_~~_~_,,,,,_,,,,-,,,,,,,,, ___.___.___.
<br />Percents a of orl final contract """'"""'"~'"""°""'"
<br />Approval by:
<br />City Engi eer /~
<br />f / ~/G~
<br />Date
<br />^ CONTRACTOR ^ OFFICE FILE
<br />Prime Contractor
<br />Date
<br />^ PURCHASING/CRO
<br />$1.633,932.99
<br />$0.00
<br />579,192.16
<br />$1.713,125.15
<br />$3.357.00
<br />$o.oo
<br />582,549.1 B
<br />_ 51,718.482.15
<br />5.05%
<br />5.05%
<br />Third Party
<br />Date
<br />01FORMStPROJECTtCONSTU2EVISEOCHANGE ORDER.XLS