CITY OF EUGENE <br />DEPARTMENT OF PUBLIC WORKS <br />ENGINEERING DIVISION <br />Change Order Job# 3693 <br /> Contract # 2007-02 <br />CONTRACTOR: Delta Construction Co. Change Ober # 7 <br />(ADDRESS) 999 Division Avenue Date: 12!21107 <br />Eugene OR 97404 CAMS Date: <br /> Reviewed b . Date: <br />PROJECT: Paving, curbs, gutters, sidewalks, street lights, water quality bioawales, Inspector. Rav emmere <br />and atormweter drainage on River Avenue from 200' east of River Road to Conet. M r. Kds Olson <br />100' west of BelOine Highway Proi. Mgr. Joe Ramirez <br /> PdnGpal Eng. Michelle Cahi ~~_ <br />Contract Contract <br />Item <br />No. <br />Item Time <br />Chan a Quantity <br />Units Unit <br />Cost <br />Amount <br />+!-) Amended <br />Change Net <br />Change <br />431 Remove 8 replace ADA ramp wing, sidewalk Orl Ina! 0.00 0.00 .00 ;O,OD <br /> panel. Install curb. Revised 0.00 0.00 0.00 <br /> Amended 1.00 L,S. 995.14 995.14 995.14 <br />432 Additional 8- concrete Ori anal 0.00 0.00 0.00 ;0.00 <br /> Revised 0.00 0.00 .00 <br /> Amended 1.00 LS. 1969.01 1968.01 1968.01 <br />491 Additional Loam at 409 River Ave Ori Ina! 0.00 p,g0 O,gg $0 ~ <br /> Revised 0.00 .00 0,00 <br /> Amended 1.00 L.S. ;393.85 393.85 393.85 <br /> Ort Ina! 0.00 0.00 0.00 x.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 1.00 L.S. 0.00 .00 ;0,00 <br /> Od Ina! 0.00 0.00 0.00 ;O,Op <br /> Revised 0.00 0.00 0.00 <br /> Amended 1.00 L.S. ;0.00 0.00 0.00 <br /> 0 anal 0.00 0.00 0.00 >t0.~ <br /> Revised 0.00 D.00 0.00 <br /> Amended 1.00 L.S. ;0.00 0.00 0.00 <br />The original contract work days are O.D da <br />The contract time change this C.O 39.o da <br />The contract time change by previous C.O.'s a3.o da s <br />The new contract work da s are 82.o da s <br />The original contract sum was <br />Net change by previous change order <br />Net change due to amendment by previous change order <br />The contract sum prior to this change order was .,.,_, <br />This change order will change contract sum by this amount ,,,,,_, . <br />The new contract net change sum <br />The new contract amendment sum <br />.__........_.._ .................___.___................._...__._._..._......__.___...._..___M..._..__.._.___....._....__.. <br />The new contract sum including this change order will be , ___~„_~~_~_,,,,,_,,,,-,,,,,,,,, ___.___.___. <br />Percents a of orl final contract """'"""'"~'"""°""'" <br />Approval by: <br />City Engi eer /~ <br />f / ~/G~ <br />Date <br />^ CONTRACTOR ^ OFFICE FILE <br />Prime Contractor <br />Date <br />^ PURCHASING/CRO <br />$1.633,932.99 <br />$0.00 <br />579,192.16 <br />$1.713,125.15 <br />$3.357.00 <br />$o.oo <br />582,549.1 B <br />_ 51,718.482.15 <br />5.05% <br />5.05% <br />Third Party <br />Date <br />01FORMStPROJECTtCONSTU2EVISEOCHANGE ORDER.XLS <br />You are directed to make the following changes in this contract: <br />Contrail <br />