CITY OF EUGENE <br />DEPARTMENT OF PUBLIC WORKS <br />ENGINEERING DIVISION <br /> <br /> <br /> <br />Change Order <br />CONTRACTOR: Oelta Construction Co, <br />(ADDRESS) 999 Division Avenue <br />Euoene OR 97404 <br />PROJECT: Paving curbs gutters sidewalks. street lights, water quality baawales, <br />and stomwrater drainage on River Avenue from 200' east of River Road to <br />100' weal d BeIlline Hi9hwav <br />You are directed to make the following changes in this contract: <br />Contract <br />Contract <br />(tarn <br />No. <br /> <br />720 Pedorm additonal work Bid Item #720, Wastewater Lateral Adjustment <br />621 Mow Stri credit kMi on final Bid Rem 820 <br />730 Drat work for 18" Concrete Storm <br />740 Extra din wodt at roaches <br />750 Constnxted Connate Cdlar at T on mainline <br />760 Remove Flat T from Storm Manhole <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />This changes the tNd Items as follows: <br />r_~w.~~t <br />item ~ <br />No. kem Tuns <br />Change Quantity <br />(Units) Unit <br />Cost <br />Amount <br />(+!-) Amended <br />Change Net <br />Change <br />720 Wastewater Lateral Adjustment 0.00 .00 .00 SO•~ <br /> Revised 0.00 .00 .00 <br /> Amended 69.00 LF. 7.00 6003.00 6003.00 <br />621 Mow Strip Credit I 0.00 .00 .00 ;0.00 <br /> R 0.00 .00 .00 <br /> Amended 1.00 L.S. 1171.00 1171.00 ;1171.00 <br />730 Exploratory work fa 18' Concrete Stomr Ina! 0.00 .00 .00 ;0.00 <br /> Revisal 0.00 .00 .00 <br /> Amended 1.00 L5. 424.05 424.05 424.05 <br />Tao Extra Gradktg work ®r Approaches mat 0.00 0.00 .00 ;0.00 <br /> Rewsal o.oo 0.00 0.00 <br /> Minded 1.00 L5. ;1047.20 1047.20 1047.20 <br />750 ConsWUed Concrete Collar ~ T an MaiMtne final 0.00 .00 0.00 ;0.00 <br /> Revised 0.00 0.00 .00 <br /> Artrertded 1.00 L5. 454.65 454.85 54.85 <br />760 Remove Flat Top Frgm Storm Manhole Ina! 0.00 .00 0.00 ;0.00 <br /> Revised 0.00 .00 0.00 <br /> Amended 1.00 L.S. ;663.30 663.30 .30 <br />The original contract work days are 0.0 da <br />The contract time change this C.O o.a de <br />The wntrad time change by previous C.O.'S 15.0 da <br />The new contract work da s are t5.0 da <br />The original contrect sum was <br />Net change by prevous change order <br />Net change due to amendment by previous change order <br />The contract sum prior to this change order was <br />This change order will change contract sum by this amount <br />The new contract net change sum <br />The new wntrect amendment sum <br />The new contract sum including this change order will b§ _,,,_.,..._....,.._,_____ <br />Percents a of orl inai contrect ....__.._..~...~.____._.__....._..___.......__ <br />NETCNANGEDU T A ENDMENTS <br />rove! by: <br />Ciry I er <br />,Date ' <br />D CONTRACTOR ~ OFFICE FILE <br />Job # 3693 <br />Contract # 2007.02 <br />Chance Omer # 3 <br />Date: 07!17107 <br />CAMS Date: <br />Reviewed by: Date: <br />Inspector: Ra Remmers <br />Const. M r. Kris Olson <br />Prof. Mgr. Jce Ram'uez <br />Principal Enp. Michelle Cahill °fyl~ _ <br />sts33,e3zsa <br />so.oo <br />;43,443.40 <br />;1,677.376.38 <br />;7.421.40 <br />;0.00 <br />sso,e6a.6o <br />;1,684,797.79 <br />3.11x <br />3.11% <br />Prime Contractor Third Party <br />Date Date <br />PURCHASING/CRO <br />OIFORM5IPROJECTICONSTVREVISED CHANGE ORDER.XLS <br />