New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3693 Change Order 2
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3693 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2010 2:20:56 PM
Creation date
7/7/2008 3:25:34 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
003693
GL_Project_Number
915014
Identification_Number
2007100052
COE_Contract_Number
2007-00002
Retention_Destruction_Date
5/1/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~,,, .~ <br />CITY OF EUGENE <br />DEPARTMENT OF PUBLIC WORKS <br />ENGINEERING DIVISION <br />Change Order <br />CONTRACTOR: Della Canslruc0on Co. <br />(ACDRESS) 999 Division Avenue <br />Eugene OR 97404 <br />PROJECT: Paving, curbs, gutters, sidewalks, street lights, water quality bioswalea, <br />end atommvatar drainage on River Avenue from 200' east of River Road to <br />100' west of Baldine Highway ' <br /> <br /> <br />You are directed to make the folbwing changes in this contract: <br />Contract <br />Contract Contract <br />Item <br />No. <br />Item Ttme <br />Change Quantity <br />Units Unit <br />Coat <br />Amount <br />+/- Amended <br />Chan a Net <br />Chan e <br />680 5"-7" Aggregate Stabilization ON final 0,00 0.00 .00 <br />;0.00 <br /> ReNSed 0.00 0.00 0.00 <br /> Amended 1.00 L.S. 1028.40 ;1026.40 ;1028.40 <br />690 Geotextile Fabric OM Inal 0.00 0.00 0.00 ;0.00 <br /> Revised o.00 0.00 0.00 <br /> Amended 4 500.00 s YD 1.50 6 750.00 6 750.00 <br />700 42" x 10"Storm Pipe Reducer Fitting 0 anal 0.00 0.00 0.00 ;0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 1.00 EACH 1443.00 ;1443.00 1443.00 <br />710 Exterior Drop WW Manhole ON Inal 0.00 O.OB 0.00 ;0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 1.00 L.s. s olz.oo s oiz.oo s 012.00 <br /> Ori anal 0.00 0.00 0.00 ;O,gg <br /> Revised 0.00 0.00 0.00 <br /> Amended 0.00 0.00 ;0.00 ;0.00 <br /> Orl Inal 0.00 0.00 0.00 ;0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 0.00 ;0.00 ;0.00 ;0.00 <br />The original contract work days are o.o da a <br />The contract Nme change this C.O o.o de a <br />The contract Nme change by previous C.O.'s 15.0 da a <br />The new contract work da s are 15.0 da <br />The original contract sum was <br />Net than e b ____.___._...._ .............__......_.. <br />g y previous change order <br />Net change due to amendment by previous change order <br />The contract sum prior to this change order was ' <br />This change order will change contract sum by this amount <br />The new contract net change sum <br />The new contract amendment sum _ _~ <br />The new contract sum including this change order will be ~~~~~~~ ~_~ <br />Percents a of o ' final contract <br />NET CHANGE DUE TO AMENDMENTS <br />Approval qy: <br />Ci E gineer <br />KJ`v~ <br />Date <br />CONTRACTOR ~ OFFICE FILE <br />Prime Contractor <br />Job 8 3893 <br />Contract # 2007-02 <br />ChangeOrder# 2 <br />Date: 08/05/07 <br />CAMS Date: <br />Reviewed bY: Date: <br />Inspector: Rav Remmers <br />Prot. Mgr. Joe Ramirez <br />Principal Eng. Michelle Cahill y(,k~, ~ <br />E1,833,932.99 <br />E0.00 <br />529,210.00 <br />_ E1.663.uz.e9 <br />E1a.z33.ao <br />Eo.oo <br />$43,443.40 <br />51.677,376.39 <br />2.66% <br />2.66% <br />Third Party <br />Date Date <br />PURCHASING/CRO <br />01FORMSIPROJECTCONS7\REVISED CHANGE ORDER.XLS <br />This changes the bid items as follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.