In addition, Mike has co-authored the Guide to Wetland Issues for Transportation Designers for the <br />American Association of State Highway and Transportation Officials. This publication was issued in September <br />1996 and has been distributed nationally, receiving very.strong praise from a varied audience. Mike is currently <br />working on a private wetland mitigation bank at his 47 acre farm in the Coyote Creek basin southwest of Eugene <br />and has just celebrated the first anniversary of his own business enterprise, Coyote Creek Environmental Services. <br />Wetland Determinations. Delineations and Documentation of Findings <br />Mike has received formal training in all aspects of wetland delineation, including intensive delineation <br />training utilizing the 1987 Corps of Engineers Manual; wetland plant identification and hydric soil geomorphology <br />(please see resume for additional professional ooursework.) In his 10+ years conducting and providing consulting <br />oversight for wetland delineations, Mike has successfiilly received both State and Federal concurrence for all of his <br />delineation projects. <br />Each of the projects listed below required a complete technical report (Wetland Determination, Wetland <br />Delineation), either for inclusion within required National Environmental Policy Ad documents (Environmental <br />Assessments or Environmental Impact Statements), or as supporting documents for various regulatory permit <br />applications. The following list is a sample of the many projects Mike has personally delineated or supervised: <br />Proiect Name Coun Study Area (Acres) <br />1135Amawn Floodplaiu Restoration Lane 170 <br />Amazon Creek (2 parcels) Lane 5 <br />Bear Creek Restoration Columbia 2 <br />Canary Road Lane 1 mile <br />Coburg Local Wetland Inventory Lane 770 <br />Coyote Creek Wetland Mitigation Bank Lane 47 <br />Diamond Ridge Subdivision Lane 260 <br />Eugene Airport Ezpansion Lane ~ 335 <br />Fern Ridge Bikepath (3 parcels) Lane 15 <br />Gilham Parent Council I;ane 5 <br />Greenhill Road (a~ Barger Drive Lane 7 <br />Halsey -Lane Co. Line Linn 12.5 miles <br />Hwy 238 -Jackson Street Jackson 10 miles <br />John Langan Property Lane 0.25 <br />Lorane Highway Bridge Replacement Lane 1.0 <br />MP 7 Lane 1 <br />North Jefferson -North Albany Linn 5 ~~ <br />Oregon Coast Highway (~,131at Lincoln 2 <br />Parsons Cc~eek Substation (EPIID) Lane 10 <br />Pleasant Valley - Greentimber Tillamook 1 mile <br />Royal Avenue TGM Project Lane 220 <br />Silverton Rd -State St Marion 5 miles <br />Siuslaw River Road Bridge Lane 5 <br />Spencer Creek Bridge Lincoln 10 <br />Springt-geld Quarry I,,ane 10 <br />Stone Forest Industries Lane 55 <br />Tangent Local Wetland LweMory _ Lane 2200 <br />Wiitit -Garfield (Phase 1) Lane 1.5 miles <br />W 11th - NCL (Phase 1) Lane 47 <br />Wetland and Stream Restoration Design and Proiect Permitting <br />With his badkgrvund in Landscape Architecture and Biology, Mike brings to a mitigation design project a <br />depth of understanding of landscape processes and habitat specifics. Mike has developed a strong reputation as an <br />em+ironmental designer, integrating multiple needs sad constraints to optimize the functioning of mitigation <br />