Olalla Cr -Hoover HiU Rd / ODOT Douglas 8+ <br />Or. Coast Hwy @ Sandlake Rd / ODOT Tillamook 1 <br />Parsons Creek Fish Screen / EPUD Lane 0.25 <br />Peninsula Road Culvert /Lane County DPW Lane 0.25 <br />Pleasant Valley - Greentimber / ODOT Tillamook 2 <br />Salt Cr Falls -Klamath Co / ODOT Lane 15 <br />Silverton Rd -State St / ODOT Marion 6 <br />Spoon Cr. Bridge / ODOT Linn 3 <br />SPTC - Silverton Rd / ODOT Marion 4 <br />Woahink Creek Culvert /Lane County DPW Lane 0.25 <br />Wiith - NCL / Martinson Mitigation Bank Lane `~ <br />j'ost-constriction Monitoring <br />Mike has conducted post-construction monitoring for many of the previously-listed projects and others. <br />This has involved designing the appropriate monitoring strategies which would measure the characteristics of each <br />particular mitigation site and inform the determination of success, as specified in the state and federal permits. <br />Mike is familiar with a variety of monitoring protocols, has participated in interagency working groin focused on <br />the issue of mitigation success, and has made presentations on Wetland Mitigation Design and Success Criteria. <br />Habitat Characterization and Sequential Rare Plant Surveys <br />Based upon Mike's education in Landscape Ar+chitectiue, Landscape Ecology and Biology, supplemented <br />with training in various landscape assessment methodologies, Mike is fully able to characterize and assess <br />functions and values of a wide variety of habitat types. These include wetland areas, riparian areas, upland areas <br />and disturbed /agricultural /urbanizing areas. Mike has received formal training in the identification of a wide <br />range of native plants. <br />The following list is a sample of projects for which Mike has performed Habitat Characterization and / or <br />Sequential Rare Plant Surveys: <br />Protect Name Count Study Area (acres) Dates <br />1135 Amazon FloodPlain Project Lane 75 2000 <br />Coyote Creek Wetland Mitigation Bank Lane 47 1999 <br />Eugene Airport Ezpansion Lane 350 1999 - 2002 <br />Fern Ridge Bikepath (3 parcels) Lane 15 1999 - 2000 <br />Laurel Hill Reservoirs Project Lane 8 2002 <br />PeaceHealth / Riverbend Project Lane 160 2002 <br />Pioneer Parkway Ezpaaslon La[a; 10 2002 <br />Royal Avenue TGM Nodal Project Lane 220 2000 <br />Fish-Culvert Replacement Monitories <br />Based upon Mdce's education and supplemental training regarding fish passage and sahnonid life cycle <br />requirements, Mike has conducted oonstrucKion monitoring on several culvert replacement projects. This work <br />typically involves on-site inspection of the work in progn~s, paying particular attention to issues of erosion control, <br />sedimentation stabilization, isolation of instream work areas, measures to ensure protection of sensitive and <br />endangered fish species. The following table displays a list of these projects. <br /> <br />Protect Name <br />Clear Lake Road Project <br />Hills Creek Road Project <br />Peninsula Road Project <br />County Dates <br />Lane 2001 <br />Lane 2001 <br />Lane 2001 <br />