New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
EWEB Inv 10.02.07
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
EWEB Inv 10.02.07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2010 2:20:56 PM
Creation date
7/7/2008 2:26:10 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
No
External_View
No
GJN
003693
GL_Project_Number
915014
Identification_Number
2008006714
Retention_Destruction_Date
5/1/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(03J1 ~i2007) M rca,~us L_ <br /> <br />- 3693-20070314EWEB CNCT Notice. <br />Page 1 <br />STREET LIGHT CONSTRUCTION NOTICE <br />~~r L <br />AGENCY: City Of Eugene EWEB DRAWING #: Da418Y' <br />EWER MAP #. E-16W,E-17W,E- <br />18W <br />City of Eugene-PWM (Maintenance) DATE: February 27, 2007 <br />City of Eugene-PWE (Capital) <br />The Eugene Water 8 Electric Board contemplates equipment changes or additions that will affect your <br />street light equipment. These plans are outlined below and shown on the attached drawing: <br />E1NE8 CONSTRUCTION PLANS <br />Install City Street Lights per City Request Per Attached drawing D-24410-1,-2,-3 <br />Developer's Name: Eugene Water & Electric Board <br />Telephone #: <br />COE Reps Name: Prepared By: Marcus lynch <br />Telephone #: Telephone #: 341-8520 <br />PO #: GJN #: <br />REPLY <br />Eugene Water & Electric Board <br />Attention: Greg Gardner <br />Electric Distribution Supervisor <br />1. Connect (high pressure sodium) street lights as per attached drawing and blll $/month as per <br />EWEB J-4 street light schedule. <br />2. This company (wfll/wiil not) be interested in this ditch for joint use. <br />3. This company (will/will not) be interested in this pole(s) for joint use. <br />Preliminary billing is as follows: <br />EWEB to bill: City of Eugene for the following work: <br />Ditch: $ <br />Duct: $ <br />Other: $ <br />Transfer: $ <br />New Installation:lnstall 1 City STILT Pole(a), Increased height on $ 18,757 <br />(2) EWEB poles, Install and Circuit (18) STILTS on River Avenue <br />Total: $ 16,757 <br />Agency: Authorized By: Date: <br />Eugene Water 8 ElectricCCBoard~~: <br />Authorized ey: ~r _ 1"aM'bt/l1"~ Date: 3 ' Z -O? <br />PO X200? -1385 2. <br />` sip <br />
The URL can be used to link to this page
Your browser does not support the video tag.