:.a, <br />AGENCY: <br />City of Eugene-PWM (Maintenance) <br />City of Eugene-PWE (Capital& PEPI) _X <br />EWEB DRAWING #:D-24157 <br />EWEB MAP #: E-16W,17W,18W <br />DATE: August 24, 2006 <br />Please provide power and install 13 -150W, and 15 -100W HPS street lights <br />These plans are outlined below and shown on the attached drawings and on EWEB drawing D-24157: <br />o:---_ ~.._ ~.___~ <br />nN pi nN~ <br />Developer's Name: Eugene Water & Electric Board <br />Telephone #: <br />COE Rep's Name: Randal Dale Prepared By: Jerry Brule and Marcus Lynch <br />Telephone #: 682-4961 Telephone #: 682-5522 and 341-8520 <br />PO #:2007003072 Good Job # 3693 <br />REPLY <br />Eugene Water & Electric Board <br />Attention: Debbie Crampton <br />Electric Distribution Supervisor <br />13 - 150W X $4.95/Mo. = $64.35 <br />15 - 100W X $3.95/Mo. = $59.25 <br />Total = $123.60/Mo. <br />1. Connect (13-150W, & 15-100W) high pressure sodium street lights as per attached drawing and bill <br />$123.60/month as per EWEB J-4 street light schedule. <br />Preliminary billing is as follows: <br />EWEB to bill City of Eugene for the following <br />work: <br />Ditch: <br />Duct: <br />Other: <br />Transfer: <br />New Installation :Install 2 City St. Lt. Poles, Increased height on (2) <br />EWEB poles, Install and Circuit (28) St. Lts. On River Ave. <br />Total: <br /> <br />Agency: -City of Eugene <br />Authorized by: By: <br />8-15-03 <br />STREET LIGHT CONSTRUCTION NOTICE <br />$ 23,812 <br />$ 23,812 <br />Eugene Water & Electric Board <br />03-?_3-~J6 Ai~':~~:~1 lid <br />Q:\PROJECTS\PROJ-3\3693 River Ave\Correspondence\EWEB\3693-StreetLightConstNtc-060817.doc <br />