CITY OF EUGENE <br /> DEPARTMENT OF PUBLIC WORKS <br /> ENGINEERING DIVISION <br /> Change Order Jobs 37a7 <br /> contract i 200e~oo9 <br /> CONTRACTOR: OREGON WOODS. INC Change Order ii ONE <br /> (ADDRESS) P.O. BOX 11680 Dete: 09121/07 <br /> EUGENE, OREGON 97440 CAMS pate: <br /> Reviewed b . Date: <br /> PROJECT: 34TH AVE 3TREAM ENHANCEMENT Inapedor: <br /> Prof. Mpr. <br /> PrinWpel Enp. <br /> You are directed to make the following changes in this contract: <br /> Contnet <br /> Ibm <br /> No. <br /> 360 Lower wstsr servip Ilna to 300 F rlc Ct to at least a foot under slresmbad excavation. <br /> 390 T le a wttonwood <br /> 400 Gonatrud 12' culvert under Frederick Ct. <br /> This changes the bid items as folbws: <br /> Contract Contact <br /> ~ Time Quantity Unit Amended Net <br /> No. Item Chan a Units Cost Amount +l- Chan a Chan e <br /> 380 LOWER WATER LINE UNDFR STREAM TO Orl Inal 0.00 0.00 ,00 60,00 <br /> 300 FREDERICK Ci Revised 0.00 . W .00 <br /> Amended 1.00 660.74 660.74 660.74 <br /> 390 TOP A COTTONWOOD TREE Orf Inal 0.00 0.00 0.00 ;0.00 <br /> Revised O.DO O.OD 0.00 <br /> Amended 1.00 ;380.25 ;380.25 .25 <br /> 400 INSTALL 12' CULVERT Ori anal O.OD 0.00 .00 :g,00 <br /> Revised 0.00 .00 .00 <br /> Amended 1.00 ;1474.69 1474,69 1474.69 <br /> Ori anal 0.00 0.00 0.00 ~,gg <br /> Revised 0.00 0.00 0.00 <br /> Amended 0.00 0.00 0.00 0.00 <br /> ON anal 0.00 D,00 p,gp ~ ~ <br /> Revised 0.00 0.00 ,Op <br /> Amended 0.00 ;0.00 0.00 .00 <br /> lkt Inal 0.00 .00 0.00 ;p,gg <br /> Revised 0.00 .00 0.00 <br /> Amended 0.00 0.00 ;0.00 ;0.00 <br /> The original ibnUail work days are o.o da <br /> The twntrail time change this C.O o.o da <br /> The contract time change by previous C.O: <br /> s D.o da <br /> The new contrail work da s are 0.0 da <br /> The original contract sum was <br /> 153 452.00 <br /> Net change by previous change order <br /> Net than a due to amendment b So.oo <br /> 9 y previous change order ~ ~ <br /> The contreil sum prior to this change order was <br /> 5753.452.00 <br /> This change order will change contract sum by this amount 52,515.86 <br /> The new contrail net change sum <br /> So.oo <br /> The new contrail amendment sum 52,515.88 <br /> he new contract sum including this change order will be 6155967 68 <br /> Pere~nta of on lnal contrect <br /> 1.84% <br /> . 8461 <br /> <br /> Approval by: <br /> Cfty Engineer Prime Contractor Third Party <br /> Date Date Dale <br /> ? CONTRACTOR ? OFFICE FILE ? PURCHASING/CRO <br /> 01FORMSIPROJECT\CONSTREVISED CHANGE ORDER.XLS <br /> <br />