~ CITY OFEUGENE -FREDERICK CT. STORM DRAINAGE SYSTEM { <br /> URS Greiner Woodward Clyde Project #52-945042ND.02 ~ <br /> Eugene Design Task <br /> Project Manager: Mike Fowler <br /> Progress Report 2 <br /> Period beginning September 11, 1999 and ending October 8, 1999 <br /> I. Budget Status Total Previous Expenditures: $350 <br /> Total Current Invoice; $315 <br /> Total Billed: $665 <br /> Contract Amount: $18,550 <br /> II. Project Work . Mike Fowler and Binhong Wu reviewed the hydraulic data provided by the City <br /> Completed for the piped components of the storm drainage system. Brian Genovese at the <br /> City was informed of the missing hydraulic data. <br /> • Shannon Spolek prepared Invoice #1. <br /> III. Work to be . Develop the hydrologic and hydraulic model of the storm drainage system. <br /> Completed during . Use the hydraulic model to analyze the system to identify flood <br /> the Next Period management problems. <br /> IV. Outstanding The City is surveying the open waterways and several storm drainage pipes to <br /> Requests for collect required hydraulic data. URS will develop the hydraulic model after <br /> Information receiving this information from the City. <br /> <br /> C:\TEMPU'R2.DOC l 0-21-99 <br /> <br />