CITY OFEUGENE - FREDERICK CT. STORM DRAINAGE SYSTEM <br /> URS Greiner Woodward Clyde Project #52-945042ND.02 <br /> Eugene Design Task <br /> Project Manager: Mike Fowler <br /> Progress Report 3 <br /> Period beginning October 9, 1999 and ending December 3, 1999 <br /> I. Budget Status Total Previous Expenditures: $665 <br /> Total Current Invoice: $2,387 <br /> Total Billed: $3,052 <br /> Contract Amount: $18,550 <br /> XI. Project Work Binhong Wu subdivided the subbasin boundaries and the hydrologic input data for <br /> Completed subbasins AMUP-190 and AMUP-200 to represent existing and future land use <br /> conditions. <br /> • Binhong Wu extended the hydraulic model for the 34`'' Avenue drainage system <br /> based on information provided by the City. <br /> • Gabriella Elder generated the cross-section data for the open waterways based on <br /> the survey information provided by Brian Genovese. <br /> • Shannon Spolek prepared Invoice #3. <br /> III. Work to be • Complete the analysis of the capacity of the system using the 10-year design <br /> Completed during storms under existing and future land use conditions. <br /> the Next Period . present a summary of the flood control problem identification to the City. <br /> IV. Outstanding None. <br /> Requests for <br /> Information <br /> <br /> C:1'I'GMP\-0041492.DOC 12-13-99 <br /> <br />