Table 7 _Tasks and Responsibilities ' <br /> L,G 4~~r?. CI ~~+T88k$~~~'~t 2~ ~W.~,"~a,. ~'..3-~~_'' ~i t^..'-~ n..~~rr ~~3;~;"',~;.~. ~,-~~~f <br /> ~1~~r r .~_~}.'7t :i <br /> Project Management (IFI) Surveying and Easement Acquisition <br /> Prepare monthly invoices Provide surveying services for designas described in Attachment A. <br /> Provide technical advice Conduct a survey to locate property monuments for preparing easement descriptions. <br /> Locate utilities, easements, public right-of--way, tax lots and environmental overlay zones. <br /> Subsurtace Investigation (CDM/AGI) Prepare easement descriptions. <br /> Acquire construction and maintenance easements. <br /> Hydraulic Analysis (IFI) <br /> Hydraulic model of channel 8 floodplain Permitting <br /> Acquire applicable federal, state and local permits. <br /> Channel Stability Analysis (IFI) <br /> Determine sizes and types of construction materials Landscape Restoration Plan <br /> Channel Layout 8 Geometry Identify native plant communities appropriate for riparian corridor and wetland enhancement <br /> Develop landscape restoration plan for riparian corridor and water quality wetland. <br /> Drawings (IFI) <br /> (to be inserted into the City's plan set) Construction Issues Identification <br /> Sheet 1 - Plan & profile of design channel Evaluate access & staging locations, equipment & materials, and site impacts. <br /> Sheet 2 - (a) Typical cross-section through a pool. <br /> (b) Typical cross-section through a riffle. Design Development & Construction Documents <br /> (c) Typical biotechnica/ bank stabilization details. Develop a landscape restoration plan for native riparian corridor vegetation establishment. <br /> Design culvert replacement at Frederick Court. <br /> <br /> Construction Oversight (IFI) Prepare construction plans. <br /> On-site technical advice during construction activity Cover Sheet <br /> General Notes <br /> 1~~mil~ ''~A'.. 4: ~ Existing Conditions Plan <br /> Design Repont Grading Plan <br /> Drawings Access, Easements, & Limits of Disturbance <br /> Channel Cross-Sections Culvert Modifications, Replacement, & Decommission <br /> Channel Details Sediment Control Plan <br /> Planting & Irrigation Plan <br /> Prepare specifications. <br /> Prepare engineers estimate. <br /> Bid Packet b Process <br /> Provide boilerplate and compile/copy bid packets. <br /> x~ <br /> <br />