New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3787 Inter Fluve Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3787 Inter Fluve Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2010 2:28:55 PM
Creation date
7/7/2008 10:12:04 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
003787
GL_Project_Number
965076
Identification_Number
2001100622
COE_Contract_Number
2003-00231
Retention_Destruction_Date
2/26/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 7 _Tasks and Responsibilities ' <br /> L,G 4~~r?. CI ~~+T88k$~~~'~t 2~ ~W.~,"~a,. ~'..3-~~_'' ~i t^..'-~ n..~~rr ~~3;~;"',~;.~. ~,-~~~f <br /> ~1~~r r .~_~}.'7t :i <br /> Project Management (IFI) Surveying and Easement Acquisition <br /> Prepare monthly invoices Provide surveying services for designas described in Attachment A. <br /> Provide technical advice Conduct a survey to locate property monuments for preparing easement descriptions. <br /> Locate utilities, easements, public right-of--way, tax lots and environmental overlay zones. <br /> Subsurtace Investigation (CDM/AGI) Prepare easement descriptions. <br /> Acquire construction and maintenance easements. <br /> Hydraulic Analysis (IFI) <br /> Hydraulic model of channel 8 floodplain Permitting <br /> Acquire applicable federal, state and local permits. <br /> Channel Stability Analysis (IFI) <br /> Determine sizes and types of construction materials Landscape Restoration Plan <br /> Channel Layout 8 Geometry Identify native plant communities appropriate for riparian corridor and wetland enhancement <br /> Develop landscape restoration plan for riparian corridor and water quality wetland. <br /> Drawings (IFI) <br /> (to be inserted into the City's plan set) Construction Issues Identification <br /> Sheet 1 - Plan & profile of design channel Evaluate access & staging locations, equipment & materials, and site impacts. <br /> Sheet 2 - (a) Typical cross-section through a pool. <br /> (b) Typical cross-section through a riffle. Design Development & Construction Documents <br /> (c) Typical biotechnica/ bank stabilization details. Develop a landscape restoration plan for native riparian corridor vegetation establishment. <br /> Design culvert replacement at Frederick Court. <br /> <br /> Construction Oversight (IFI) Prepare construction plans. <br /> On-site technical advice during construction activity Cover Sheet <br /> General Notes <br /> 1~~mil~ ''~A'.. 4: ~ Existing Conditions Plan <br /> Design Repont Grading Plan <br /> Drawings Access, Easements, & Limits of Disturbance <br /> Channel Cross-Sections Culvert Modifications, Replacement, & Decommission <br /> Channel Details Sediment Control Plan <br /> Planting & Irrigation Plan <br /> Prepare specifications. <br /> Prepare engineers estimate. <br /> Bid Packet b Process <br /> Provide boilerplate and compile/copy bid packets. <br /> x~ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.