G <br /> inter•fluve, inc. <br /> 1020 Wasco Street Suite I <br /> <br /> ~4r Hood River, Oregon 97031 <br /> (541)386-9003 <br /> vrww.interfluve.com <br /> City of Eugene <br /> W. 34"' Avenue Drainage Project <br /> Monthly Progress Report <br /> Date: November 26, 2001 <br /> To: Brian Genovese, P.E. <br /> City of Eugene <br /> Engineering Division <br /> 858 Pearl Street <br /> Eugene, OR 97401 <br /> From: Mike McAllister, P.E. <br /> Inter-Fluve, Inc. <br /> Re: Progress Report for July Invoice <br /> Inter-Fluve developed a detailed HEC-RAS hydraulic model for a segment of the <br /> proposed stream alignment from the downstream end of the project up to the pipe <br /> crossing. The model predicts water surface elevations, flow regimes, water velocity and <br /> shear stress along the modeled segment. <br /> Using results from the model, channel stability analyses were conducted to establish <br /> stable channel dimensions and rock size to accommodate the range of expected flows. <br /> Design alternatives were discussed for the upstream segment, which extends from the <br /> pipe crossing to the culvert outlet. <br /> OREGON WASHINGTON MONTANA WISCONSIN _ <br /> <br />