Geotechnical investigation 05/12/2000 <br /> Proposed Storm Drdnage Improvemerns-West S7th Avenw to Fredorick Court 12:39 <br /> Eugene, Oregon <br /> PEpS+ONNEL <br /> PRIN PROJ STAFF SR <br /> EN/GEO EN/GEO TECH DRAFT CL <br /> Tdsk 1 -Project 1Aeetlng/Data Gathering <br /> Attend lack-off meeting 8 <br /> Cmordinate Field Work 1 <br /> A mtnistration/Contract 2 0.5 11.5 <br /> Ta1ak 2 - Fleld Invest/Lab/Report <br /> Travel Time 4 <br /> Beckhoe Inspection Time 6 <br /> Develop Lab Tenting Program 0.5 <br /> Water Content/Claaalfication 1 <br /> Tybe Classifications (3) 3 <br /> Gfain Size Analysis 4.5 <br /> Reduce/Compile Field Data-toga 0.5 2 <br /> Reduce/Compile Lab Data 0.5 <br /> Develop Area Gedogy 2 <br /> Miscelaneoua 1 <br /> Pr are/Submit Geotechnk:al Re 4 4.5 33.5 <br /> Teak 3 - Erosion/Scour/Remedial Analyses <br /> (See proposal text for Inter-Flwe scope of work.) <br /> 0 <br /> TOTAL STAFF-HOURS 10 7.5 12 8.5 7 0 45 <br /> RATE 5125.00 x83.00 x67.00 560.00 567.00 550.00 <br /> SUBTOTALS 51,250 5623 $804 5510 5469 50 53,656 <br /> R l BURSABLE EXPENSES Unit Rate Units Totals <br /> Backhoe Subcontractor LS 5518 <br /> biter-Flow, Inc. (Task 3) LS 510,658 <br /> Dedk;ated Field Vehk:le 540.00 day 1 540 <br /> Auto Travel 50.38 mile 450 5171 <br /> Field Supplies day 550 <br /> Qommunications/Photos LS 540 <br /> oduction/Misc ense LS 550 <br /> Subtotal Reimbuntabla 11 527 <br /> BASIC PROJECT TOTAL 515,182 <br /> <br /> eugene5.wk1 BASIC PROJECT TOTAL (rounded) 515,180 <br /> <br />