New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
PAF3787
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
PAF3787
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2010 2:28:56 PM
Creation date
7/7/2008 9:30:11 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Authorization
PW_Active
No
External_View
No
GJN
003787
GL_Project_Number
965076
Retention_Destruction_Date
2/26/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> • ~ - URS Greiner Woodward Clyde <br /> Mr. Steve Gallup <br /> City of Eugene <br /> March 12, 1999 <br /> Page 3 <br /> The City's GIS team will also provide a base map of the study area that contains the following: <br /> f <br /> • lot lines and property ownership <br /> • street right-of--ways and street names <br /> • topographic contours <br /> j • existing storm drainage system <br /> 4I • open waterways <br /> ( • existing sanitary sewers and water lines ~ <br /> Once the drainage system deficiencies are identified, the City will survey the existing grade along <br /> the alignment of proposed drainage system improvements. The City will also verify the location <br /> I <br /> of existing utilities that may conflict with proposed drainage system improvements. <br /> i <br /> PROJECT STAFF <br /> Mike Fowler, P.E. will serve as the project manager. John Holroyd, P.E. will provide project <br /> r oversight and QA/QC. Todd Coleman, P.E. and Rod Lundberg, EIT will provide design <br /> engineering services. Leroy Pettijohn will provide CAD services. Shannon Spolek will serve as <br /> project administrator. <br /> ESTIMATED BUDGET <br /> The total cost to complete the analysis and preliminary design of capital projects is $18,550. A <br /> detailed breakdown of hours and staff by task are presented in Table 1. Labor billing rates, based <br /> on a 3.1 multiplier, are also shown in the table. <br /> SCHEDULE OF WORK <br /> Tasks 1 and 2 will be completed within six weeks of receiving the information described above in <br /> ~ City Services Required. <br /> I' <br /> If you have any questions regarding the above scope of work, please call Mike Fowler at 503-948- <br /> 7233. If the scope of work and cost estimate is acceptable, please sign below to authorize a new <br /> f task under our existing contract. We look forward to working with you on this project. <br /> i <br /> S:\PROPOSAL\Prop99\nonumber\upamazon.doc 03/12/99 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.