j <br /> 1 '4 i <br /> Date. The effective date of the Contract shall be the latest date of signature by the parties. <br /> 22. Effective <br /> CITY OF EUGENE CONTRACTOR <br /> By: <br /> atur (signature) <br /> Angel L. Jones Avon Lee Babb <br /> City Manager Pro Tem President <br /> ~ Date: / _ ~ ' ~ 7 <br /> Date: I O <br /> i C <br /> ,L.~ ' <br /> i ~ r ! C~ <br /> j <br /> I <br /> i <br /> <br /> is ublic Im rovement Contract for Use with Oregon Standard Specifications -Page 6 <br /> P p <br /> (Revised February 2004) <br /> <br />