New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3827 Warranty FA 12.08.07
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3827 Warranty FA 12.08.07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 1:57:02 PM
Creation date
7/3/2008 3:27:45 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
003827
GL_Project_Number
905244
Identification_Number
Final Acceptance
COE_Contract_Number
2006-00004
Retention_Destruction_Date
12/18/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Final Acceptance Pubrcworks <br /> Completion of Warranty Period Engineering <br /> ~I 244 East Broadway <br /> Eugene, OR 97401 <br /> (541)682-5560 <br /> (541) 682-8410 <br /> To: Delta Sand and Gravel Date: December 18, 2007 <br /> 999 Division Ave. <br /> Eugene, OR 97404 From: Dan Kepley <br /> r <br /> <br /> ~ Project: 3rd & 4t" Connector <br /> <br /> 1 <br /> Contract Number: 2006-04 Job Number: 3827` <br /> A warranty inspection has been made on this project in accordance with Section 00150 of the <br /> City Standard Specifications and Standard Drawings. <br /> No defects were noted and/or were corrected the project is hereby accepted by the City for <br /> i <br /> permanent maintenance. <br /> FOR PRIVATELY ENGINEERED PROJECTS ONLY <br /> Engineer. <br /> Address: <br /> Owner. <br /> Address <br /> - <br /> Q:\PROJECTS\PROD-7\3827\CORRESP\CONTRCTR\Final Acceptance Completion of Warranty Period.doc <br /> ENG 1122 Contractor File Engineer Owner Surety PW Admin Construction Manager ~}a Revised 4/04 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.