STREET LIGHT CONSTRUCTION NOTICE <br /> AGENCY: EWER DRAWING <br /> EWER MAP E-19P3, 19P4 <br /> DATE: November 30, 2005 <br /> City of Eugene-PWM (Maintenance) <br /> City of Eugene-PWE (Capitai& PEPI) X <br /> Add 7 - 70 W ,10 -100 W, and 1 - 200 w. HPS street lights as shown on the attached light plan. <br /> EWEB CONSTRUCTION PLANS <br /> 3~ & 4 Ave. Connector -Project # 3827 <br /> Developer's Name: City of Eugene Eugene Water & Electric Board <br /> Telephone #:Steve Gallup 682-8460 <br /> COE Rep's Name: Randal Dale Prepared By: Glen A. Fee <br /> . Telephone 682-4961 - Telephone 682-5195 <br /> PO #:2006009621 <br /> REPLY <br /> Eugene Water 8 Electric Board (lOW) 7X $3.15 = $22.05+ <br /> Attention: Debbie Crampton (100W)10X $4.00 = $40.00 <br /> Electric Distribution Supervisor (200W) - $6.10 <br /> Total = $68.15 <br /> 1. Connect (Add 7-70W,10-100W,1-200W) high pressure sodium street lights as per attached <br /> <br /> ~,r? drawing and bill $68.15 per month as per EW EB J-4 street light schedule. <br /> Preliminary billing is as follows: <br /> EWEB to bill City of Eugene for the following <br /> work: <br /> Ditch: $ <br /> Duct: $ <br /> Other: $ <br /> Transfer: $ <br /> New Installation: (multiply the number of connections times $ 40 .~$~IU <br /> here) <br /> Total: <br /> Agency: -City of a Euge Water Electric Board <br /> Authorized by: By: <br /> &15-03 <br /> <br />