• <br /> • Trails Eng. <br /> Inv. #549 Skinner Butte Administratlon <br /> - - - <br /> , <br /> 1)_Walked prolect, no contractor on job (see daily diary) 9/27/05 2~ ~ - 1 p, - <br /> - <br /> _ 2) Thursday morning rield meeting (9/29/05) ~ 2 _ 10 <br /> ~ 3) Walked prolect no contractor on job (see dail diary) 10/03/05 2 - 1 p <br /> _ _ <br /> 4 <br /> Met with contractor with G~ty (10/06/05) 2.5 _ 10 _ <br /> 5) Walk_ <br /> ed protect, refined centerline on routes 2a, 2b, and the _ 3 10 <br /> toff route 7 (see daily diary) (10/08/05) - _ <br /> B) Met with contractor and city, modified Route 2B, eliminated Route 2 10 <br /> _ <br /> 2A,~usted junction for Routes 2,_26 and 7 (10113/05). <br /> Walked Route 7, reflagged and refined line. Contractor was 2.5 10' <br /> wo_rkin on the end of Route 2 and Route 2A (see dail dia___ - <br /> ~ Y ry) (10/15/05) <br /> 8) Walked all of Routes 1 2 2B, and 5 to looked at all work <br /> - - ~ <br /> accom Ip fished so far Met with Ci and Contractor Re .for weekly <br /> _ _~meeting• (10/20/05_ 2 _ 10 <br /> 9) Walked Routes, 1, 2, 26, 5, 5A and 56 and located grade dips (see _ ~ - <br /> dail diary). ,Talked to Contractor at Junction of Route 1 & 7A (see <br /> daily diary). (10/23/05) - g <br /> btotal ~ 21 90 <br /> <br /> ~r <br /> Page 1 <br /> <br />