Riverpoint/Gilham Road Stormwater Management Project <br /> City of Eugene Project Number 3849 <br /> Monthly Narrative Report <br /> Reporting Period: November 28, 2003 through December 26, 2003 <br /> Prepared by: Mark Bransom <br /> Work Accomplished During the Reporting Period <br /> • Prepared meeting materials and graphics <br /> • Met with City to discuss draft technical memorandum findings and next phase <br /> of project work <br /> • Edited draft hydrologic/hydraulic technical memorandum and figures <br /> • Project Management <br /> Work Planned for next Reporting Period <br /> • Complete incorporation of City comments, and edits to, draft technical <br /> memorandum <br /> * Submit final draft hydrologic/hydraulic technical memorandum <br /> • Prepare scope and level of effort estimate for next phase of work <br /> • Begin next phase of work <br /> Key Assumptions, Decisions, Froblems, and Possible Changes <br /> • Hydrologic/hydraulic technical memorandum will be finalized as a Draft <br /> Document, and not sealed <br /> Status of Budget <br /> • The budget is 82 percent spent. <br /> <br /> POX~C:1ppCUMENTS AHD SET71NG51LHURTV.OCAL SETTINGSITEMPORARYINTERNET ALES40LI(491RIVERPOINT GILHAM AD. SWNARRATIVE 1203.DOC 1 <br /> <br />