a~°' <br /> <br /> r <br /> Riverpoint/Gilham Road Stormwater Management Project <br /> City of Eugene Project Number 3849 <br /> Monthly Narrative Report <br /> Reporting Period: December 26, 2003 through January 31, 2004 <br /> Prepared by: Mark Bransom <br /> Work Accomplished During the Reporting Period <br /> • Completed edits of draft hydrologic/hydraulic technical memorandum and <br /> figures <br /> • Developed draft scope of work for next phase of work <br /> • Project Management <br /> Work Planned for next Reporting Period <br /> • Submit scope and level of effort estimate for next phase of work to incorporate <br /> Mirror Pond topographic data and produce flood inundation zone maps <br /> • Begin next phase of work <br /> Key Assumptions, Decisions, Problems, and Possible Changes <br /> • None <br /> Status of Budget <br /> • T'he budget is 88 percent spent. <br /> PDX\C:\D000MENTSRND SETTINGS\LHURT\LOCAL SETTINGS\TEMPORARY INTERNET FILES\OLK49\RIVERPOINT GILHAM RD. SW NARRATIVE 0104.DOC 1 <br /> <br />