to <br /> <br /> Notification of Commencement and Public Works <br /> <br /> Cofnpletion Dates for Contract Projects Engineering <br /> i <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541)682-5560 <br /> DATE CONTRACT NO. <br /> 6/22/2006 200600007 <br /> P[~OJECT NAME JOB NO. <br /> Ar'nazon Park Improvements 93003870 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> 2G Construction, Inc. Na <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> 'dam Steffen 682.5040 8/4/2005 <br /> FAST NOTIFICATION <br /> IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 06-26-06A06:12 RCVD <br /> A~L CLAIMS FOR ADDITIONAL COMPENSATION Mt1ST BE SUBMITTED BY: <br /> ( EE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> tHIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. * See Special Warranty Provision below. <br /> H/19/2006 IS THE DATE ON W HICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> LANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> ~EQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> i <br /> ~ ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1 AND #2, ALL WORK IS GUARANTEED <br /> Y THE CONTRACTOR FOR ONE YEAR FOLLOW ING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE <br /> ARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED <br /> NE YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WO K THAT <br /> ECOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ON - EA WARRANTY <br /> PERIOD W ILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. <br /> • <br /> Inspector Sig re <br /> Special Warranty Provision <br /> !Turf areas, other than the new irrigated athletic field, are conditionally accepted. This generally includes, but is not limfted to, areas where new <br /> lutilities and irrigation were installed and the perimeter of new walks and the new athletic field. Also as discussed and agreed upon this includes the <br /> )north and west side of the new athletic field where additional grading and seeding work may be required prior to Final Acceptance. Reference <br /> Specification Section 01030.42. Re-inspection of the turf areas will be made by the Agency representative in early September, 2006 and any <br /> grading or turf repair work identified shall be addressed and completed by the Contractor no later than October 15, 2006. <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Manager File <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> APAII 2004 <br /> Q:\P ROJECTS\P R OJ-0\3870\COR R ESP\CONTRCT R\#3870-20060620-Fi rstSecondTh i rd Notif ication#3. doc <br /> <br />