Run Date': 11/'09/2005 14:42:27 <br /> City of Eugene Page 2 <br /> Contract Preliminary Progress Payment <br /> Payment No 003 <br /> Contractor: 2G CONST. Original Contract: <br /> Job 93-003870 $770,768.21 <br /> Current Amount: $823,752.62 <br /> Contract No: 2006-00007 Contract Award Date: 08/04/2005 <br /> PO 2006100092 <br /> Assessable: No Completion Date: 12/01/2005 <br /> Current Contract Estimated Payment Cumulative Totals 8 Complete <br /> Line Description _ Last Chnq Ord Unit Price Unit Measure Quantity Amount Quantity Amount <br /> Quantity Amount <br /> AMAZON PARR IMPROVHMHNT <br /> General <br /> 0000 Liquidated Damages ($700.00) DAY 0.000 $0.00 0.000 $0.00 0.000 $0.00 <br /> 0.00 <br /> 0010 MOBILIZATION $98,189.08 LUMPSUM 1.000 $98,189.08 0.000 <br /> $0.00 1.000 $98,189.08 M 100.00 <br /> 0020 TEMP PROTHCTN DIRECTN $1,997.00 LUMPSUM 1.000 $1 997.00 0.100 <br /> $199.70 0.900 $1,797.30 90.00 <br /> 0030 WHTLAND AND TRHH PROTHCTION F8 $3.35 LINFT 2,000.000 $6,700.00 0.000 <br /> $0.00 2,927.000 $9,805.45 146.00 <br /> 0040 EROSION PREVENTION MULCH BERM $3.96 LINFT 1,450.000 $5,742.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0050 EROSION PREVENTION, OTHER $435.00 LUMPSUM 1.000 $435.00 0.000 <br /> $0.00 0.800 $348.00 80.00 <br /> 0060 ATHLETIC FIELD STRIPPING AND H $8.03 CUYD 2,150.000 $17,264.50 0.000 <br /> $0.00 2,150.000 $17,264.50 100.00 <br /> 0070 ATHLETIC FIELD ROUGH GRADING $0.09 SQFT 160,000.000 $14,400.00 0.000 <br /> $0.00 160,000.000 $14,400.00 100.00 <br /> 0060 ATHLETIC FIELD SOIL AMENDMENTS $82,989.00 LUMPSUM 1.000 $82,984.00 0.000 <br /> $0.00 0.900 $74,685.60 M 90.00 <br /> 0081 ADDITIONAL SAND FOR ATHLECTIC 001 $47,176.16 LUMPSUM 1.000 $47,176.16 1.000 $47,176.16 1.000 <br /> $47,176.16 100.00 <br /> 0090 ATHLETIC FZELD IRRIGATION SYST $36,061.00 LUMPSUM 1.000 $36,061.00 0.150 <br /> $5,409.15 0.950 $34,257.95 95.00 <br /> 0091 REPAIR MODIFY EXISTING IRRIGAT 001 $2,102.76 LUMPSUM 1.000 $2,102.76 1.000 <br /> $z,1o2.76 l.ooo $z,loz.76 loo.oo <br /> 0092 ADDITIONAL WIRING FOR FIELD IR 001 $3,705.49 LUMPSUM 1.000 $3,705.49 1.000 <br /> $3,705.49 1.000 $3,705.49 100.00 <br /> 0100 SAND CHANNEL GREENS DRAINAGE S $178,200.00 LUMPSUM 1.000 $178,200.00 0.000 <br /> $o.oo l.ooo $17e,2oo.0o M loo.oo <br /> 0110 8" ADS DRAIN PIPE AND CATCH HA $12.21 LINFT 1,180.000 $14,407.80 0.000 <br /> $0.00 1,198.000 $14,627.56 102.00 <br /> 0120 DRAIN PIPS PVC 8" $16.61 LINFT 230.000 $3,820.30 0.000 $0.00 230.000 <br /> $3,820.30 100.00 <br /> <br /> 0130 DRAIN OUTFACE AT AMAZON CREEK $16,017.00 LUMPSUM 1.000 $16,017.00 0.000 <br /> $0.00 0.900 $14,415.30 90.00 <br /> <br /> 0190 LAWN PREP AND SEEDING $0.08 SQFT 160,000.000 $12,800.00 1.000 <br /> $0.08 1.000 $0.08 0.00 <br /> <br />