FW: Job Closeouts Page 2 of 2 <br /> At Amazon Park we need to repair some sand channel drainage along the new wetland planting that was <br /> interrupted by irrigation trenching. I believe we got a quote some time back for $7500 or so to do the work., but <br /> we didn't pursue it. 1 don't recall why. I think it would be good to set funds aside to do that. Otherwise I think we <br /> can close these projects out. Let me know if you agree. <br /> Scott <br /> Scott Milovich <br /> Principal Landscape Architect <br /> City of Eugene <br /> Public Works Engineering <br /> (541)682-6086 <br /> <br /> 3/28/2008 <br /> <br />