New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3870 Funding Info
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3870 Funding Info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 1:59:06 PM
Creation date
7/2/2008 10:48:16 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Admin Documents
PW_Active
No
External_View
No
GJN
003870
GL_Project_Number
905232
Retention_Destruction_Date
11/28/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r ~ 5YS~'~MS 13~Li'~PM~~T GHARC~~ ~XP~tCfCCUFtE AI.t~4GATjON WQI2K8HEET ' <br /> . <br /> Project Name: Amazon Park Improvements <br /> Project Manager Name: Emily Proudfoot <br /> Servile ID ti (e.g. Good Job Number 004161): 3870 Contract # (e.g. zoos-o5os): Capital Project # (e.g. eos2aa?: 905232 <br /> ' ' ' ` i SDG~xp@nd~ttlt'~t:Regtt/t@tlt~lltS <br /> 3 <br /> tnp ~ ~ Fees..May tra apetSt on"hf nn aapitet ipravements inctudad.ln aiq adopted Gspitat improvement Pt>~n that titct+~ase capac~tft Headed to <br /> provtdti kgsfor ttrture u€sera, iticttii~n~ ttii~ei#?~It P~c?vide nevriaailtttes orcrsasethe.aatwci3~x Provided bq.existing laatFt~fe>6.. . <br /> Wastewater Ellglble: Non-assessable components of projects attributable to future development that drain those portions of pipes within the total area served by <br /> the project. fQuantily portions of project that are capacity enhancing; pro-rate design/construction management costs on a proportionate basis.] <br /> Stormwater Eligible: Non-assessable components of pipe or open channel projects attributable to future development that drain impervious surface areas within <br /> the total drainage basin served by the project. (Quantify portions of project that are capacity enhancing by determining the percent of project that will serve new <br /> development: The tofa! existing impervious area of basin divided by the future build-out impervious area of basin equals the percent of project serving existing <br /> development. Subtract from 100% to derive the percentage of project that will serve new development.] _ _ <br /> Transportation EIIgi61e: Non-assessable components attributable to future development of 1) arterial and collector street projects and related traffic signals, and <br /> 2) off-street bicycle path projects. (Quantify portions of project that are capacity enhancing; pro-rate design/construction management costs on a proportionate <br /> basis. In the case of major enhancement projects (e.g. Ferry Street Bridge), use analysis to establish the percent of projected trips on the facility that can be <br /> attributed to new development between year of construction and build outj. _ <br /> Parks Eligible: Components of Neighborhood or Community park projects attributable to future development. (Quantify portions of project that are capacity <br /> enhancing versus those portions needed to serve existing users. Pro-rate design/construction management costs on a proportionate basis.] <br /> Rr?im 6~ tiJ~in?: bier speM;cNffy orl~+cn lr~tprtn.nts lncludaa iet!,ut l4daigtad capatst ~r~iovettiertt T~la~t,. i~.e ~tr.itc <br /> :~4: <br /> fAC a ii'reh~ftaaotezii '~ilttieii~". <br /> Wastewater Ellglble: Components noted above as wel! as rehabilitation of existing systems (may also serve existing development). <br /> Stormwater Eligible: Components noted above as well as rehabilitation of existing systems (may also serve existing development). <br /> Transportation Eligible: Per Council Resolution No. 4718, reimbursement fees will be budgeted for preservation and maintenance of the existing system <br /> <br /> , (Council or the Budget Committee may subsequently allocate some or all for a different purpose as allowed bylaw). No transportation reimbursement SDC <br /> revenue is currently attributable to off-street bicycle paths; therefore no reimbursement fee expenditures are allowed for paths. _ _ <br /> Parks Ellglble: No parks SDC revenue is currently attributable to a reimbursement fee; therefore no reimbursement fee expenditures are allowed. <br /> ~Mffif.! ~s" ~9rCiN1td~6tt O/ TOta/ PIT1feGt COSf,S , : x~ p ~ <br /> l~rojact&rl~fa$xai>'~Ptisas • { ~k?PItaSA ' ,..l~rall~erat° . <br /> Wastewater Improve. Fee $ % $ % $ <br /> Approved Amounts, if different: $ % $ % $ <br /> W ~ t~eNfl~f~f. irtla : tt ° ~ ~ n, ~ <br /> . y...,. <br /> ~ ~ <br /> Stormwater Improve. Fee $ % $ % $ <br /> Approved Amounts, 'rf different: $ % $ % $ <br /> ~ <br /> r <br /> tef lrltltlrlit tT1! •;-••a=.: ` <br /> - <br /> , - <br /> „ <br /> , <br /> . <br /> Transportation Improve. Fee $ % $ % $ <br /> Approved Amounts, 'rf different: $ % $ % $ <br /> „ , <br /> T Railatbuale 1aa $ °!a S' - <br /> ett°Arltoi~'ttls;ltdNt o ~ <br /> ` ItCipt~rft,)~ef 0 0 $323,500.00 32% $ i <br /> 1. , <br /> „ <br /> ' ~ $ <br /> € . Rrb»lwt'ss Dyer; +S N(a S ;w N!A °Io ti . "1+N3¢i' <br /> n <br /> EafperHtlturu Afit9Ca~t>r0 .tl>Jeatlon , , <br /> , . <br /> . u~ret?tAkfian that'detnanstt~dsa Ott ai',~CiG f~cndipg'of tats cap~tt. pr?~?J±pct at P..roject ~ttlat~?~ s as as;n time M' any ~ ~ - <br /> are . M ret!LaMne of 8D+C attoaadon au~urtfslper~atttagea:: ~ ' . <br /> ` `taMtf i~egt4trsa an ~t>ltraat a~eottnttrig_ ~ SiRG expertditttres WY syt;tett:l ~fhe P~ terei.~'An soc etcpertdttarti may belegaityr tittailangM'fojr ppW _ . <br /> t4i+a iea~atter+xtte"exptlndttttrt#; <br /> t.. <br /> t'r ,~s~ - - - - - - - - - <br /> . <br /> Date: Date: ~ Date: i <br /> C:\Documents and Settmgs\ceweeap\My Documents\Project DocumentsWmazon Park\SDCAllocationWrksheel04Mar xis Revised March, 2004 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.