New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3886 Thompson Landscapes Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3886 Thompson Landscapes Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 7:29:53 PM
Creation date
7/2/2008 10:14:03 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
003886
GL_Project_Number
905382
Identification_Number
2004100268
COE_Contract_Number
2004-05305
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E. East Bank of Amazon Creek -This planting area extends along the east bank of <br /> Amazon Creek approximately halfway between the intersection with the bike path to <br /> the north and the intersection with the A-3 channel to the south. <br /> Species Original Amended Expected Spacing Clusters <br /> Quantity Quantity Planting <br /> Date <br /> <br /> Ascle ias s eciosa 200 275 10/03 12"-18" 6-9 <br /> Aster hallii 0 75 10/03 24"-30" 3-5 <br /> Erio hyllum lanatum 200 290 10/03 12"-18" 6-9 <br /> Lomatium nudicaule 200 200 4/04 12"-18" 6-9 <br /> Lu inus rivularis 200 290 10/03 24"-30" 3-5 <br /> Lu inus of h llus 200 200 10/03 24"-30" 3-5 <br /> Potentilla acilis 200 200 10/03 12"-18" 6-9 <br /> Perideridia s 200 200 4/04 12"-18" 6-9 <br /> Saxifraga ore ana 200 0 N/A 12"-18" 6-9 <br /> Sidalcea vir ata 200 200 10/03 18"-24" 6-9 <br /> Sis 'nchium idahoense 200 200 4/04 12"-18" 6-9 <br /> W ethia an stifolia 200 100 10/03 24"-30" 3-5 <br /> F. A-3 Channel Overlook -This small planting area is located 20-50 meters to the west <br /> of the bike path overlook area, near the top of the south bank of the A-3 channel. <br /> Species Original Amended Expected Spacing Clusters <br /> Quantity Quantity Planting <br /> Date <br /> Ascle ias s eciosa 150 225 10/03 12"-18" 6-9 <br /> Aster hallii 0 75 10/03 24"-30" 3-5 <br /> Erio h llum lanatum 150 230 10/03 12"-18" 6-9 <br /> Lomatium nudicaule 150 150 4/04 12"-18" 6-9 <br /> Lu inus rivularis 150 230 10/03 24"-30" 3-5 <br /> Lu inus of h llus 150 250 10/03 24"-30" 3-5 <br /> Potentilla acilis 150 150 10/03 12"-18" 6-9 <br /> Perideridia s 150 150 4/04 12"-18" 6-9 <br /> Saxifra a oregana 150 0 N/A 12"-18" 6-9 <br /> Sidalcea vir ata 150 170 10/03 18"-24" 6-9 <br /> Sis 'nchium idahoense 150 150 4/04 12"-18" 6-9 <br /> W ethia an stifolia 150 0 N/A 24"-30" 3-5 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.