Kim Mast <br /> Graphic Designer <br /> City of Eugene <br /> 682-5548 <br /> From: RICHARDSON Philip S <br /> Sent: Friday, May 14, 2004 12:03 PM <br /> To: MAST Kim M; HANSON Jeff P; PROUDFOOT Emily A <br /> Cc: RINER Andrea G <br /> Subject: Sign Insert Request <br /> Hi Kim, <br /> I'd like to request a sign insert for the Milton Park construction project. We hope to get the sign up as soon <br /> as possible. Rather than using my original text in bold below, it should actually read something like this: <br /> Improvements to Milton Park Coming Soon! <br /> Construction includes new play equipment, benches, picnic tables, sidewalks, signs, irrigation, trees <br /> <br /> I, and plants. <br /> Construction will be complete this fall. For more information, call 682-4800 <br /> Funded by Parks and Open Space bond measure 20-03. <br /> Emily, let us know if you have any edits. <br /> Jeff, just a heads up that we'll be needing one of the backing boards sometime soon. <br /> -Philip <br /> -----Original Message----- <br /> From: WEISS Carolyn J <br /> Sent: Friday, May 14, 2004 11:28 AM <br /> To: RICHARDSON Philip S; PROUDFOOT Emily A <br /> Subject: RE: Milton Park Sign <br /> Work with Kim Mast to have the insert made, she knows the drill. We should have some of the backing <br /> boards in the yard some where (talk to Jeff Hanson). I'll put the detail and sample sign text on your chair. <br /> -Carolyn <br /> -----Original Message----- <br /> From: RICHARDSON Philip S <br /> Sent: Friday, May 14, 2004 10:45 AM <br /> To: WEISS Carolyn J; PROUDFOOT Emily A <br /> Subject: Milton Park Sign <br /> Hi, <br /> We want to get a MILTON PARK CONSTRUCTION /S ON THE WAYDAMN/Tl (or whatever it is that <br /> those things say) sign up. Carolyn, can you help me figure out how to get the sign made? Emily, <br /> could you let me know the soonest that the contractor could get the sign up? If it isn't soon enough <br /> then I'll see if maybe Richard Zuckers crew can help. <br /> Thanks, <br /> -Philip <br /> 2 <br /> <br />