New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3923 CH2M Hill Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3923 CH2M Hill Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2011 4:31:13 PM
Creation date
7/1/2008 1:35:31 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
003923
GL_Project_Number
935034
Identification_Number
2007100367
COE_Contract_Number
2007-00226
Retention_Destruction_Date
6/20/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
is not expected to have high levels of diesel traffic. The report will include a short discussion of <br /> PMio Hot Spot Analysis with respect to the current project. <br /> <br /> Work Products <br /> CH2M HILL shall provide the City an air quality technical report up to 30 pages in length, <br /> including graphics and appendices. . <br /> <br /> Assumptions and Data Needs <br /> • An Indirect Source Construction Permit (ISCP) determination is not included in this scope of <br /> work. <br /> • It is assumed that no more than 3 intersections will be evaluated for air quality impacts. <br /> • No construction emissions. will be calculated in this scope of work <br /> • A burden analysis is not included in this scope of work. <br /> • MOBILE 6.2 Vehicle emission factors will be provided by Lane Regional Air Pollution <br /> Authority or CH2M HILL will calculate the emissions factors using readily available <br /> information. <br /> • The city will provide AM and PM peak hour traffic volumes and LOS for all new, modified <br /> and impacted signalized intersections, the PDF Synchro Data for existing, opening year <br /> (build and no build) and horizon year (build and no build) for intersections with LOS of D <br /> or worse, including: <br /> • Laneage (number of lanes and directions including lane widths <br /> • Traffic volumes -peak hour <br /> • Signalized Intersection Information (actuated or pretimed) <br /> • Green Time <br /> • Red time <br /> • Cycle time <br /> • Existing and proposed posted road speed <br /> • Based on our previous discussions, the budget assumes that there will be no more than one <br /> meeting associated with the air quality scope. <br /> Budget <br /> CH2M HILL.proposes to complete this work on a lump sum basis, with a task fee of $11,500 for <br /> the scope described above. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.