New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3907 Aspen Springs Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3907 Aspen Springs Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 1:59:49 PM
Creation date
7/1/2008 11:57:30 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
003907
GL_Project_Number
915182
Identification_Number
2005100119
COE_Contract_Number
2005-00011
Retention_Destruction_Date
4/5/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> . CITY OF EUGENE <br /> PROPOSAL ' <br /> JULY 29, 2004, 2:00 P.M. JOB #3907 BID NUMBER 22 <br /> TO THE CITY MANAGER BIDDER: Aspen SprinQS Co. <br /> EUGENE, OREGON <br /> The undersigned Bidder declazes: <br /> That Bidder has cazefully examined and incorporates in this Proposal, by this reference all documents included <br /> in the Book of Contract Documents and Specifications for this job which includes but is not limited to the Plans, City <br /> Standazd Specifications and Standard Drawings, Supplemental and Special Specifications, and City of Eugene <br /> Amendment #l, Addenda, Bid Schedule, Prevailing Wage Rates, Contract Form, and Bond Form for <br /> AWRRFY PARK RFNnVAT><nN <br /> AT 42.91 RTVF,R RnAn <br /> ('APTTAI< TMPRCIVFMF,NT PRniT,C'T_ <br /> That Bidder has made an examination of the site of the proposed work and has made such investigations as are <br /> necessary to determine the chazacter of the material and the conditions to be encountered, independently of the indication <br /> on the plans; and that if the Proposal is accepted, Bidder will contract with the City of Eugene as provided in the Contract <br /> Fom~, will to the extent of this bid, provide the necessary machinery, tools, apparatus, and other means of construction, <br /> and will fiunish all material and labor as specified, or called for by the Plans or necessary to complete the work in the <br /> manner specified and in accordance with the requirements of the Engineer. <br /> The undersigned also agrees that Bidder will order all material and equipment included under this contract and <br /> will commence work within ten (10) days after receipt of Notice to Proceed and that Bidder will complete the work in <br /> all respects aftercommencement and will have the project completed BY OCTOBER 29.2004 and that Bidder will <br /> pay as liquidated damages to the City for any delay, the sum of FIVE IiUNDRED DOLLARS ($500.00) per day for <br /> each day required beyond that period. <br /> PROPOSAL -JOB #3907 PAGE 1 0[ 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.