New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
PAF3951
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
PAF3951
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 2:24:26 PM
Creation date
7/1/2008 9:53:07 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Authorization
PW_Active
No
External_View
No
GJN
003951
GL_Project_Number
935182
Retention_Destruction_Date
11/5/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Draft February 17, 1999 <br /> Capital Project Fact Sheet Basin Name: Amazon Basin <br /> . Project AM06A <br /> Project Identifier AMOSA <br /> Project Title Kinney Park Neighborhood Facii <br /> Project Location <br /> CP is located just north of Martin Dr. in Kinney Park between W. Amazon Parkway and Center Way .The <br /> location can be torurd on sewer map index page 71, serial map s22. k: <br /> I <br /> AMF~VIf <br /> Subbasin ' <br /> GIS U/S Node Location 65387 <br /> GIS D/S Node Location 65382 <br /> Drainage Area Served by Capital Project ~ 214 Acres <br /> Impervious (1994 Existing Land Use) i 14 <br /> I Impervious (Future) ! 351 <br /> Design Flow (Future Conditions) ~ N/A, ~ <br /> Project Description <br /> ! '(Restore <br /> flow to ttie historical diannel through a newly constricted culvert and constnrct a 7 ac-ft neighborhood <br /> ' (water quality facility in Kinney Park. <br /> - <br /> Pro1eCf Elements <br /> 50 Ft - 42" CSP (2-5 ft. Dover) <br /> ~ 7 Ac-Ft - Wet Extended Detention Pond <br /> ~ 600 LF - Open Channel Improvements (Type 1) <br /> Problems andlor Opportunities Addressed by the Capital Projects <br /> Problems <br /> Segment AMHW010B in the piped storm system which runs west beneath Martin Dr. and discharges into the <br /> ~ Amazon Creek is expected to be derrdent for a 10-year storm under future land use conditions. <br /> ! 1 <br /> I <br /> opportunities <br /> Open space adjacent to the historic charnel in Kinney Park provides an opportunity to construct a neigtibortwod <br /> <br /> ~ water quality facility. <br /> I <br /> 1 <br /> Page 1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.