New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
PAF3950
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
PAF3950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2008 11:25:34 AM
Creation date
7/1/2008 9:34:19 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Authorization
PW_Active
Yes
External_View
No
GJN
003950
GL_Project_Number
915096
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Eugene <br /> Estimate stribution <br /> Estimate: Martin Drive Pipe Improvements \ - \ J <br /> Job 93-003950 <br /> Job Descr: MARTIN DRIVE PIPE IMPROVEMENTS <br /> Line No, Description Quantity Unit Unit Price Amount <br /> MARTIN DRIVE PIPE IMPROVEMENTS <br /> General <br /> 0010, MOBILIZATION 1.00 LUMPSUM $5,000.00 $5,000.00 <br /> 0020, TEMP PROTECTN/DIRECTN 1.00 LUMPSUM $1,000.00 $1,000.00 <br /> 0030. EROSION CONTROL 1.00 LUMPSUM $1,500.00 $1,500.00 <br /> 0040. CONCRETE 4" 500.00 SQFT $3.50 $1,750.00 <br /> 0050. CURB & GUTTER, REM/REPL 120.00 LINFT $40.00 $4,800.00 <br /> 0060. DRAIN PIPE CONC 42" 350.00 LINFT $85.00 $29,750.00 <br /> 0070. MH 42"-59" PIPE - STM 1.00 EACH $4,000.00 $4,000.00 <br /> 0080. MH SEDIMENTATION - STM 1.00 EACH $5,500.00 $5,500.00 <br /> 0090. TV INSPECTION 350.00 LINFT $1.00 $350.00 <br /> Total General $53,650.00 <br /> Total MARTIN DRIVE PIPE IMPROVEMENTS $53,650.00 <br /> MARTIN DRIVE PIPE IMPROVEMENTS - Other / Direct <br /> General <br /> 0001. Testing 2~ of Contract $1,073.00 <br /> 0011. Contingency 150 of Contract $8,047.50 <br /> 0021, Advertising 1.00 LUMPSUM $500.00 $500.00 <br /> Total General $9,620.50 <br /> Total MARTIN DRIVE PIPE IMPROVEMENTS - Other / Direct $9,620.50 <br /> <br /> MARTIN DRIVE PIPE IMPROVEMENTS - Miscellaneous <br /> General <br /> 0001. Engineering Charge 1.00 LUMPSUM $15,940.00 $15,940,00 <br /> Total General $15,940,00 <br /> Total MARTIN DRIVE PIPE IMPROVEMENTS - Miscellaneous $15,940.00 <br /> Total Martin Drive Pipe Improvements $79,210.50 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.