v <br /> • ~ ~ <br /> D <br /> W <br /> D <br /> m <br /> <br /> - PSF Data Base m <br /> p <br /> C <br /> !ob ~ 5 ~ Contract <br /> Manage : Est. Const. Cost: <br /> ~ ~ ~ Average PSF Rate: ~~s - ~ <br /> Wprk Type Budgeted Dollars 23% PSF Dollars 23% Hours <br /> Assessments <br /> Design <br /> Facilities <br /> Inspection - <br /> Other S-C'orrs9' ' <br /> Su~v~ <br /> Right of Way <br /> Survey/Const f`~ r ~ <br /> f~, Survey/Topo ` <br /> Budgeted Dollars: These numbers are used for a more realistic budget, especially if the project is <br /> small or has a high slope. <br /> 2~% PSF Dollars: 23% of the construction cost is budgeted for PSF. The total for all eight work <br /> tykes in the 23%PSF Dollars column should equa123% of the construction cost. <br /> 23% Hours: This number will default to the 23%PSF Dollars divided by the Average PSF Rate. <br /> This number can be overrides if necessary. <br /> Average PSF Rate: The Darwins have found that a value of $65 works for them. Since this <br /> report deals with PSF dollars, and everybody's PSF rate is different, the average is used to <br /> ciompute hours. <br /> <br />