MARTIN STORM PIPE/KINNEY P RESTORATION Pro <br /> ject <br /> ENGINEERING ES ur/ATE Prepared by: Sharlett - PM • <br /> Kinney Park Area and Martin Drive from W.Amazon to Center Way PWE, Darwin Team <br /> 3/1 /02 <br /> GENERAL CATEGORY SPECIFIC TASK PERSON HOURS PSF/HOURLY COMBINE PSF SS~S <br /> Design CADD work/plnns 3076/6076/9076 ET 200 65 65 ~ 13,000.00 <br /> Plnn review by staff at30/60/90 PM (3) 5 75 225 ~ 1,125.00 <br /> <br /> Survey and Data 6nthering Construction Staking ET (2) 16 65 130 $ 2,080.00 <br /> Final Measure ET (2) 8 65 130 ~ 1,040.00 <br /> Inspector Inspection ET 120 65 65 ~ 7,800.00 <br /> As-Guilts ~ Final Poy ET 16 65 65 ~ 1.040.00 <br /> ~ 26,085.00 <br /> REMAIWIN6 WORK Wrk Type 121/131!136 399 26.085.00 <br /> Eng. Expenses to date Totol hrs for 121/127/136/184/620 ~ 19,919.59 <br /> Eng. Expenses needed ~ S ,_I_' 46 _004_59) <br /> The dollars needed for this project are for the change in scope. The original budget was to upsize the existing 36" pipe. The original budget was for the scoping, <br /> planning, public involvement and preliminary engineering. ConsuRant fees were also included in the original budget. The new budget is for removing . I <br /> and replacing the existing 36", 42" and 48" because of structural failures. The money for this project shall come from storm funding(uk,~t~~s~ •~,r~-~ • `"Q ~'F°'~"'~ ' <br /> <br />