t ' <br /> EUGENE WATER & ELECTRIC BOARD <br /> ELECTRIC UNDERGROUND EXTENSION AGREEMENT <br /> <br /> 'Date of Application: August 11, 2004 <br /> CITY OF EUGENE, hereinafter called the customer, requests the Eugene Water & Electric Board, hereinafter called EWEB, to extend its electric system to <br /> serve: <br /> Project Name & Location: ARROWHEAD PARK DEVELOPMENT <br /> ARROWHEAD ST. NORTH OF MERLOT AVE. <br /> Customer agrees the electric distribution extension will be provided in accordance with the requirements and obl'~gations of thisAgreement and <br /> the attached Exhibits. Utility service is also subject to EWEB's applicable policies, regulations and rates now in existence or hereafter adopted, and the <br /> attached drawing #C-23217. Customer has received and read copies of EWEB's existing written policies and standards. <br /> Customer will execute all easements required by EW EB at no cost to EWEB. When practical, the customer will inGude such easements in the <br /> recorded plat of the above-mentioned development. Customer will further record deed restrictions requiring underground service to all properties to be <br /> served by the underground distribution system being installed. Customer agrees that all easements shall provide that no buildings or structures maybe <br /> constructed on such easements. <br /> Customer is aware of the right, as provided in ORS 92.097, to employ a licensed engineer to design or supervise the installation of the <br /> improvements provided for in this Agreement, but deGines to do so. <br /> Unless otherwise speed in this Agreement, the customer agrees to pay for the following extension charges priorto EWEB's cxxrurrencement of <br /> work: <br /> Contribution in aid of construction = S 3884 <br /> Other = N/A ~ <br /> All charges above are subject to change if this Agreement is not signed and returned within thirty (30) days ofthe application date above and if <br /> the extension facilities are not installed with permanent service connections within six (6) months of the date of application. <br /> This Agreement authorizes EWEB to proceed with the necessary steps to provide electrical underground seaices as shown on the attached <br /> drawing; however, it is understood that until the conditions of this Agreement are complied with, EWER will not install the extension facilities. <br /> Customer agrees to inform all subsequent owners of the requirements and obligations of underground service in accordance with the Board's <br /> policiesand procedures. This Agreement shall bind and benefit the heirs, personal representatives, sucxessors or assigns of the respective parties. <br /> ® EWEB-CONSTRUCTED SUBSTRUCTURES: J <br /> Customer will be responsible for providing, within six inches (6") of final grade, compacted level ground of adequate width for <br /> EWEB to install the utility systems. Customer will provide finished grade stakes and property comers so EWER can install the utility .r <br /> system at proper depth and location. Customer will monitor EWEB's installation to assure the installation is according to stakes that <br /> have been provided. <br /> ? CUSTOMER-INSTALLED SUBSTRUCTURES: ~ ~ <br /> Customerwill own and maintain all customer-installed ducts and vaults, including service ducts in accordance with EWEB's ~ <br /> service policies. EWEB will own and maintain all other underground system facilities. K is understood that the customer will <br /> construct and furnish service lateral, including duct, trench and backfill in accordance with EWEB policy. ~ ~ <br /> ~ <br /> Customer assumes all liability and agrees to indemnify EWER for all damages to EWEB facilities caused by the customer or <br /> customers agents. <br /> After one year, EWEB shall assume ownership and responsibility for maintenance and repair of the service laterel conductors . <br /> J <br /> only. (See Board Policy, Electric Service Section IID(5).) <br /> ? DEVELOPER-INSTALLED SUBSTRUCTURES: <br /> EWER shall allow Developer to construct substructure facilities required to serve a development. <br /> Electric substn,rcture Installed in accord with Construction By Developer (CBD) policy must comply with the CBD Handbook, ~ ~ <br /> approved drawings, standards and material specifications. All work will be inspected, and installations that do not comply will not be <br /> energized. Once accepted, electric substructure installed by the CBD policy becomes the property of EWER. Developers are -t' <br /> required to provide payment and performance bonds, and to warrant the work for one year after acceptance. <br /> All service conduit will be installe , ow and maintained bycustomer. t~ <br /> Date Customer Signed: fS`lI) 6 o Z G <br /> ~ ~ M ~ ~ Business Phone <br /> <br /> ',CITY OF EUGENE ~L r G ~ <br /> <br /> 'Corporation name and Customer Name (Printed) ~ ~ ~jz- s a 3 Z <br /> Fax Number <br /> ~ /li, <br /> Custo ignature ~sV~l S~~ r b3 ~ <br /> Cellular Phone <br /> <br /> ;244 E. BROADWAY <br /> EUGENE, OREGON 97401 <br /> Mailing Address Company TIN# <br /> EUGENE WATER 8 ELECTRIC BOARD Customer Soaal Security Number <br /> BY Job #:26040 Job Chief: VYOLFE <br /> Electric Distribution Supervisor Banner Acct m.a.: \ <br /> Date: <br /> Date Connected <br /> rte 2~ 1 ~ <br /> ~ Revised: 9/16/03 <br /> <br />