~ City ~ ugene <br /> Engineer stimate <br /> Estimate: Arrowhead Park Prelim Estimate <br /> ~ Job 93-003999 <br /> Job Descr: ]1RROpTFOi71D PARK <br /> Line No. Description Quantity Unit Unit Price Amount <br /> ARROWBa71D PARK <br /> General <br /> 0010. MOBILIZATION 1.00 LUMPSUM $0.00 $0.00 <br /> 0020. CLEARING & GRUBBING LUMPSUM <br /> 0030. TEMP PROTECTN/DIRECTN LUMPSUM <br /> 0040. EROSION CONTROL LUMPSUM <br /> 0050. Construction 1.00 LUMPSUM $153,000.00 $153,000.00 <br /> Total General $153 000.00 <br /> Total ]1RROW8~1D PARK $153, 000.00 <br /> ARROWSBAD BARK - Other / Direct <br /> General <br /> 0010. Contingency 108 of Contract $15,300.00 <br /> 0020. Inspection, Project Management 7Rr of Contract $10,710.00 <br /> 0030. SDCs 1.00 LUMPSUM $20,000.00 $20 000.00 <br /> 0040. Permits 1.00 LUMPSUM $5,000.00 $5,000.00 <br /> Total General <br /> Total ARROFIERAD pAR1C - Other / Direst $51,030.00 <br /> $51,010.00 <br /> ARROWBBAD HARK - llisaellaneons <br /> General <br /> 0010. Engineering Charge 1.00 LUMPSUM $35,000.00 $35,000.00 <br /> 0020. Engineering Charge - survey LUMPSUM $3,000.00 <br /> Total General <br /> Total ARRO'fi9Y71D PARK - Miscellaneous $35,000.00 <br /> $35,000.00 <br /> Total Arrowhead Park Prelim Estimate $239,010.00 ~ <br /> 7~ 000 <br /> Z~L~a1o.01~n+ ~`a(O` <br /> < V' t <br /> <br /> I <br /> <br />