New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3984 CH2M Hill Contract A#1
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3984 CH2M Hill Contract A#1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2010 4:31:56 PM
Creation date
6/30/2008 2:53:41 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
003984
GL_Project_Number
925096
Identification_Number
2005100264
COE_Contract_Number
2005-00208
Retention_Destruction_Date
7/1/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Scope of Work CH2MHILL <br /> Initial Project Task Work and Scope Development for <br /> the Polk Street Outfall Project # 3984 <br /> PREPARED FOR: Terry Colvin/City of Eugene <br /> PREPARED BY: Mark Bransom/CH2M HILL <br /> DATE: September 21, 2004 <br /> DESCRIPTION <br /> The purpose of the tasks described in this document is to undertake critical initial project <br /> tasks leading to development of a comprehensive scope of work, schedule, and project <br /> <br /> budget for the Polk Street Outfall project, City project #3984. Much previous work has been <br /> completed on this project; to ensure that the CH2M HILL project team is familiar with that <br /> work, we propose to assemble and review relevant existing information. Subsequent to a <br /> review of project information we propose to hold a scoping meeting with City staff. <br /> Following the scoping meeting, CH2M HILL will prepare a detailed scope of work, project <br /> schedule, and project budget, based on a full understanding of past efforts, and the City's <br /> goals and objectives for the current work. <br /> TASKS <br /> Task 1. Compile and Review Existing Background Information <br /> Task 1.1- CH2M HILL will work with City staff to identify and compile existing <br /> information held by the City related to past studies, evaluations, site conditions, and other <br /> materials relevant to the current work. These materials may include: aerial photography, <br /> topographic and other mapping, reports, logs, as-built and other drawings for existing <br /> development, utility plans for proposed developments or redevelopment, the current <br /> stormwater management master plan, water quality data, and other relevant information. It <br /> is assumed that the City of Eugene will provide CH2M HILL with copies of information <br /> determined by the project team to be relevant. <br /> CH2M HILL will review the existing background information to gain an understanding of <br /> site conditions, previous work, and potential constraints and opportunities for consideration <br /> in an alternatives analysis. In addition, discussions maybe held with various City staff who <br /> hold knowledge regarding site conditions, previous work, and potential constraints and <br /> opportunities for consideration in an alternatives analysis. Discussions with City staff will <br /> be arranged through the City Project Manager. <br /> PDXIPOLK ST OUTFACE SCOPE DEVELOPMENT.DOC 1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.