sip a s Zoos <br /> CH2MHILL <br /> Polk Street Outfall Stormwater Quality Project - <br /> City of Eugene Project Number 3984 <br /> Monthly Narrative Report <br /> Reporting Period: July 29, 2005 through August 26, 2005 <br /> Prepared by: Mark Bransom <br /> Work Accomplished During the Reporting Period <br /> • Completion of the 50% design package for the vault <br /> • Internal QA/QC reviews of the 50% design <br /> • Submittal of the 50% design package for the vault <br /> • Project Management <br /> Work Planned for next Reporting Period <br /> • Incorporate City review comments on 50% design package for the vault <br /> • Perform value engineering of vault design for construction cost savings <br /> • Submit 95% design package for the vault for final City review <br /> • Initiation of design on remaining water quality units <br /> Key Assumptions, Decisions, Problems, and Possible Changes <br /> • Corrections have been made to billing rates for several individuals billed at <br /> incorrect rates. Line items have been included on this invoice describing the <br /> changes to the current and past invoices. <br /> • Schedule milestones are aggressive and require all parties to make every effort to stick to <br /> review periods, etc. <br /> As indicated in the contract amendment scope and budget estimate, an assessment of <br /> the adequacy of the design budget would be done. As the vault design is completed and <br /> we receive survey data to begin design of the water quality units upstream of the vault, <br /> we will need to assess the change in the number of units to be designed, the level of <br /> design detail required and remaining budget. A budget amendment may be necessary. <br /> Status of Budget <br /> • The budget is approximately 76 percent spent. <br /> <br /> `~.r <br /> PDX~E:~BRANSOM, MARK~323992~POLK ST OF SW QUALITY NARRATIVE 0805.DOC 1 <br /> <br />