Tetra Tech Fee Proposal Attachment C: Costs <br /> <br /> Contact: P08523-0001-01 ` <br /> <br /> Task Order #001 <br /> Modlficatlon 00 <br /> Project: Eugene Delta Ponds Permilting <br /> Eugene Delta Ponds Permit Support Fee Proposal <br /> TASK DESCRIPTION LABOR, INCLUDING OVERHEAD SUBTOTALS BY TASK <br /> Principal OA/OC Sr. Proj. Hydraulic Staff Drafter / Admin/Cleri <br /> Manager Engineer Engineer CADD cal Total Hours <br /> $210 $189 $185 $144 $89 $69 $45 <br /> 1 Compile and Review Existing Information 4 8 8 4 24 <br /> $2,800.00 <br /> 2 Hydrologic Analysis 4 4 4 4 16 <br /> $1,964.00 <br /> 3 Hydraulic Analysis 4 28 32 4 68 $7,912.00 <br /> 4 Floodplain Mapping 4 12 12 24 52 $5,208.00 <br /> 5 Report Preparation 4 24 16 12 8 64 $8,824.00 <br /> 6 City and FEMA coordination 2 4 6 $y~ ~ <br /> 7 Principal /Contract Management 2 8 8 18 $2,260.00 <br /> HOURLYSUBTO7ALSBYDISCIPUNE 2 22 g 80 72 44 20 248 $27,922.00 <br /> Itemaed Travel and Materials <br /> MATERIALS AND REPRO <br /> LABOR SUBTOTAL $27,922.00 <br /> TRAYEUMATERIALSSOBTOTAL $837.00 Descri lion Unit Cost Quanti Cost <br /> Total Contract Value Color Co 'n $1.00 $0 <br /> $28,759.00 8.5 x 11 co ies $0.10 100 $10 <br /> 11 x 17 co ies with foldin $0.20 20 $4 <br /> Oversize co ies r s.f. $1.00 12 $12 <br /> Bindin $2.00 $0 <br /> Com uter $3 96 $288 <br /> Com uterTimeCADD $14 32 $448 <br /> TOTAL MATERIALS $762 <br /> TRAVEL <br /> Descri lion Unit Cost Quantit Cost <br /> Mifea a for Coordination with Local Flood $0.375 200 $75 <br /> TOTAL TRAVEL $75 <br /> <br />