.-.y <br /> Attachment A Page 1 of 1 <br /> COE Contract 2007-00209 <br /> SCOPE OF WORK <br /> EUGENE DELTA PONDS TECHNICAL REVIEW <br /> City of Eugene <br /> Prepared by: Tetra Tech/KCM, Inc. <br /> August 4, 2006 <br /> Task 1-Review Design Submittals from ACOE Design/Build Contractor <br /> Provide hydrologic/hydraulic engineering review on the 65% and 95% designs for the inlet <br /> culvert at Eugene Delta Ponds. No structural engineering review is required. Only the 65% and <br /> 95% designs will be reviewed. If an additional submittal requires review, then a modification to <br /> this contract will be required. <br /> Task Z -Attend Two Project Review Meetings <br /> Attend two project review meetings with ACOE and City staff and ACOE contractor to provide <br /> comments, etc. Assume each meeting is anall-day meeting to be held in Eugene, OR. Tetra Tech <br /> is not responsible for preparing meeting minutes. Task includes travel to and from Eugene for <br /> each meeting. <br /> The proposed cost is attached in Attachment B. The cost to complete this work is based on <br /> negotiated contract billing rates for labor and materials and does not include any application fees <br /> or data fees charged by any agencies. Answering questions via telephone is included in this <br /> estimate, but any lengthy (longer than 1 hour) teleconferences or review of additional submittals <br /> is not included and a contract modification would be required. <br /> <br /> C:\Documents and Settings\cewejmo\Local Settings\Temporary Internet Files\OLK122\Eugene Delta Ponds Technical Review Final Scope <br /> <br /> City.doc <br /> <br />