weeks ago, so I apologize if 1've caused afund-tracking problem for you. <br /> Please call me if you have any questions about this matter. Thanks for your help, <br /> Kevin <br /> x6018 <br /> -----Original Message----- <br /> From: COLVIN Terry R <br /> Sent: Monday, October 25, 2004 10:18 AM <br /> To: CAHILL Michelle R; FINNEY Kevin P <br /> Subject: Dragonfly Bend Excavation Quantity <br /> We have finished our preliminary final quantity takeoffs for Dragonfly. We were very close to what was <br /> predicted for Long Haul Quantities estimate. Below is a breakdown of numbers for your needs. We <br /> havn't gotten with our contractor as of yet but will do that soon. This is just a heads up (and <br /> preliminary bill :)for your dirt delivered. I do want to say that this was a very rewarding opportunity that <br /> follows the objectives of sustainability and should be promoted within our community. Thanks tc <br /> Estimated Long Haul by Bid 30,000 cu yd. Quantity takeoff for Long Haul 30,382 cu yd. <br /> Cost: Long Haul Bid = $8.25 cu yd <br /> Short Haul Bid= $5.51 cu yd <br /> Difference between going short haul and long haul (Cost to Delta Ponds) _ $2.74 cu yd. (30,382) _ <br /> $83,246.68 <br /> We will verify and finalize this with our contractor in the coming two weeks. <br /> Small biNs in a manilla envelope will be tine. <br /> Terry Colvin <br /> Project Manager <br /> City of Eugene <br /> Public Works, Engineering <br /> <br /> 244 E. Broadway <br /> Eugene, Oregon 97401 <br /> <br /> (541)682-5398 <br /> <br /> (541)682-8410 fax <br /> 2 <br /> <br />