City of Eugene <br /> Engineer'stimate <br /> ` Estimate: De Ponds Restoration _ <br /> Job 93-004003 <br /> Job Descr: DELTA PONDS RESTORATION <br /> <br /> 4 <br /> Line No. Description <br /> Quantity Unit Unit Price Amount <br /> DELTA PONDS R88TORATION <br /> General <br /> 0010. MOBILIZATION <br /> LUMPSUM <br /> 0020. CLEARING 6 GRUBBING LUMPSUM <br /> 0030. TEMP PROTECTN/DIRECTN LUMPSUM <br /> 0040. EROSION CONTROL LUMPSUM <br /> Total General <br /> $0.00 <br /> Total DELTA PONDS RE3TORATION <br /> DELTA PONDS RESTORATION - Miscellaneous <br /> General <br /> 0010. Engineering Charge 1.00 LUMPSUM <br /> Total General $40,000.00 $40,000.00 <br /> $40,000.00 <br /> Total DELTA PONDS RE3TORATION - Miscellaneous ,440,000.00 <br /> Total Delta Ponds Restoration $40,000.00 , <br /> <br />