<br /> ~ <br /> _ T r <br /> ~ - ~ -J _ _ <br /> - - - <br /> - <br /> - ~ ~ <br /> 3 r~, io , <br /> • ~ <br /> i <br /> OPEN HOUSE <br /> Thursday, April i, 4:30 to 6:30 p.m. <br /> at the Eugene Chamber of Commerce <br /> 1401 Willamette Street <br /> ~ Willamette Street from 13th to 19th avenues is scheduled <br /> for paving repair work this symmer as part of the Ciry~ <br /> pavement preservation program. In addition,Willamette <br /> ~ Street from 13th to 18th avenues will be convened to two- <br /> way operation. <br /> At the open house, Ciry of Eugene staff will have maps and <br /> drawings showing the construction limits and will be <br /> available to address concerns and answer questions.about <br /> the proposed operational changes. <br /> For information about the twaway conversion: <br /> j Chris Henry,Transportation Planning Engineer <br /> chris.c.henr~@ci.eugene.orus • (541) 682-8472 <br /> For information about the pavement preservation project <br /> Teri Higgins, Project Manager <br /> teri.l.higgins@ci.eugene.orus <br /> (541)682-8462 <br /> ;I <br /> t~ ~ D 3 Zs <br /> 1-31 36 <br /> 3~ <br /> <br />