Run Date: 06/06/20 Q7 12:05:37 <br /> • ~ Page 3 <br /> City of Eugene <br /> ^ Contract Preliminary Progress Payment <br /> Payment No 007 <br /> Contractor: 2G Constructio¢ _ Original Contract: $748,776.98 <br /> Job 93-004048 Current Amount: $802,651.49 <br /> Contract No: 2007-00009 Contract Award Date: 07/31/2006 <br /> PO 2007100067 Completion Date: 10/31/2006 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals 8 Complete <br /> Liae Description Last Chnq Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0210 PREFABRICATED BRIDGE 6 ABUTMEN $27,878.00 LUMPSUM 1.000 $27,878.00 0.000 $0.00 1.000 $27,875.00 100.00 <br /> 0220 FILTER FABRIC - PLAY AREA SUBG $0.60 SQFT 6,380.000 '$3,828.00 0.000 $0.00 6,300.000 $3,780.00 99.00 <br /> 0230 FENCE $15.30 LINFT 2,070.000 $31,671.00 0.000 $0.00 1,425.000 $21,802.50 69.00 <br /> 0240 DOG PARK BNTRANCE ENCLOSURE <br /> $1,584.00 EACH 2.000 $3,168.00 0.000 <br /> $0.00 1.000 $1,584.00 50.00 <br /> 0250 MAINTENANCE ACCESS GATE $550.00 EACH 6.000 $3,300.00 0.000 $0.00 4.000 $2,200.00 67.00 <br /> 0260 MULCH PATH - CONSTRUCTION $3.21 SQPT 8,000.000 $25,680.00 0.000 $0.00 7,830.000 $25,134.30 98.00 <br /> 0270 PICNIC TABLE - 8' ACCESSIBLE, <br /> $1,829.00 EACH 1.000 $1,829.00 0.000 <br /> $o.oa l.ooo $l,ez9.oo loo.oo <br /> 0280 PICNIC TABLE - 8' FIXED $1,871.00 EACH 1.000 $1,871.00 0.000 $0.00 1.000 $1,871.00 100.00 <br /> 0290 BENCH - 5' $1,022.00 EACH 4.000 <br /> $4,088.00 0.000 $0.00 4.000 $4,088.00 100.00 <br /> 0300 LITTER RECEPTACLES $994.00 EACH 5.000 <br /> $4,970.00 0.000 $0.00 4.750 $4,721.50 95.00 <br /> "viiv BI~iCLE RACKS <br /> $149.00 HACH 5.000 $745.00 0.000 <br /> $0.00 5.000 $745.00 100.00 <br /> 0320 PLAY EQUIPMENT - INSTALL CITY $14,792.00 LUMPSUM 1.000 $14,792.00 0.000 $0.00 1.000 $14,792.00 100.00 <br /> 0330 PLAY EQUIPMENT - KOMPAN SPRING $1,292.00 EACH 2.000 $2,559.00 0.000 $0.00 2.000 $2,584.00 100.00 <br /> 0340 PLAY SDRFACING, HNGZNSHRSD P1O $30.34 CDYD 320.000 $9,708.80 0.000 $0.00 400.000 $12,136.00 125.00 <br /> 0350 RESILIENT PAD $694.00 EACH 7.000 $4,858.00 0.000 $0.00 6.000 $4,164.00 86.00 ~ <br /> 0360 IRRIGATION SYSTEH $80,947.00 LUMPSUM 1.000 $80,947.00 0.000 $0.00 0.950 $76,899.65 M 95.00 <br /> 0361 MODIFY IRRIGATION SYSTEM 001 $6,452.96 LUMPSUM 1.000 $6,952.96 0.000 $0.00 1.000 $6,452.96 100.00 <br /> 0370 FINB GRADING $0.07 SQFT 423,600.000 $29,652.00 0.000 $0.00 451,484.000 $31,603.88 107.00 <br /> 0380 CONIFER TREES - 6' HT $171.60 EACH 25.000 $9,290.00 0.000 $0.00 12.000 $2,059.20 48.00 <br /> 0390 DECIDUOUS TREES - 2" CAL $261.80 EACH 38.000 <br /> $9,998.90 0.000 $0.00 97.000 $12,304.60 129.00 <br /> 0400 DECIDUOUS TRESS - 1.5" CAL $206.80 EACH 98.000 $20,266.40 0.000 $0.00 47.000 $9,719.60 48.00 <br /> 0410 ~ PLANTS - PLUGS $1.35 EACH 1,500.000 $2,025.00 0.000 $0.00 1,500.000 $2,025.00 100.00 <br /> <br /> oazo HULes $l.ae EACH l,ooo.ooo $1,e5o.oo o.ooo $o.oo l,ooo.ooo $l,5eo.oo loo.ao <br /> <br /> 0430 LAWN SEEDING <br /> $0.08 SQFT 308,500.000 $24,680.00 0.000 <br /> $0.00 257,532.000 $20,602.56 83.00 <br /> <br />