<br /> RE: Royal Creek Subdivision
<br /> In reference to the Candlelight Park, Exchange Agreement dated)uly 17, 2002
<br /> and the follow-up Agreement dated January 6, 2003, I have calculated the
<br /> associated developer and city costs as stated in the agreements.
<br /> The costs are based on the actual construction costs as completed by Morse
<br /> Bros. I have included a copy of their bid schedule for the Royal Creek
<br /> Subdivision construction for your reference.
<br /> The construction costs for the portions of Throne Drive and Welcome Way
<br /> adjacent to the City Park site do not include any utility construction such as
<br /> electric, water T.V., telephone or natural gas. In addition, soft sub-grade over-
<br /> excavation of the streets and street lights on Throne Drive were also excluded.
<br /> THRONE DRIVE: (APPROX. 1.,632 L.F.) i ~ ~
<br /> C & G: 3264 Lf. @ $6.00 = $19,584 ~ ~
<br /> Street Excavation: lump sum = $5,000
<br /> Top soil stripping: lump sum $1,600
<br /> Crushed Rock: 2890 tons @$9.00 = $26,010 ~ f '7 L-~
<br /> A.C.: 1,294 tons @ $3].00 = $40,1 14
<br /> ' ~8" san.: 1,227 I.f. @$30.00 = $36,810 i~'~~~~~_-•a-----°"
<br /> I~S~, 6" san.: 426 Lf. @ $23.00 = $9,798 p~.~Ey-~.w_.~,_____.
<br /> ~ 4" san.: 200 Lf. @ $17.00 = $3,400
<br /> San manhole: 7 ea. @ $1 ,900 = $13,300 ~~~I~`-_..--.-----~-°~
<br /> 10" storm: 244 I.f. @ $19.00 = $4,636
<br /> ' ~15" storm: 214 I.f. @ $23.00 = $4,922
<br /> 1~9? ~24" storm: 326 I.f. @ $30.00 = $9,780 S?S ~~6 =~3.~{So
<br /> 30" storm: 575 I.f. @ $36.00 = $20,700
<br /> 1`36" storm: 138 I.f. @ $43.00 = $5,934 X38 x~ 1, 7~`/
<br /> Storm manhole: 9 ea. @ $1,400 = $12,600
<br /> Curb inlets: 12 ea. @ $700 = $8,400
<br /> Concrete crosswalks: 3 ea. @ $1 ,900 = $ 5,700
<br /> Va11ey Gutter: 1 ea. @ $3,100 = $3,100
<br /> Construction staking: lump sum = $3,600
<br /> Engineering: lump sum = $1 5,000 '
<br /> TOTAL = $249,988 , 3- ~ l