~k Eugene Water & Electric Board <br /> 500 East 4th Avenue /Post Office Box 10148 `-'V <br /> E W EB 549 484-P419on 97440- Fax8541-484-3762 <br /> August 14, 2006 <br /> Scott Milovich <br /> City of Eugene Public Works N Engineering <br /> 858 Pearl Street <br /> Eugene, OR 97401 <br /> Project: 900 Throne Dr <br /> Estimated Cost: The cost for providing (1) 2" metered service at 900 Throne Dr., Eugene, OR is <br /> $46,978.00 including SDCs. <br /> Bacldlow Requirements: <br /> 1. An approved Double Check Valve assembly installed on the service line, before the first branch <br /> line, will be allowed on the domestic metered service with the understanding that any in-house <br /> high hazard cross connections are protected at the point of connection with an approved Reduced <br /> Pressure Type backflow preventer (this would be any cooling, heating or injection make-up <br /> lines). A branch line for irrigation may installed between the meter and DCVA, provided the line <br /> is properly protected with a state approved backflow preventer as per plumbing code <br /> requirements <br /> A. Spring assisted hatch type access (minimum 3' x 3'); <br /> B. Permanently attached galvanized ladder (if more than 4' deep); <br /> C. Provisions for drainage <br /> D. As per the attached standard drawing, the test cocks of the backflow assembly shall be <br /> equipped with water tight threaded plugs or caps. <br /> E. All vault borings shall be grouted. <br /> I have included information to assist in the installation of these facilities. All backflow prevention <br /> equipment shall meet EWEB=s minimum installation standards (enclosed) and will be inspected by <br /> EWEB for compliance with these requirements. Corrections performed by EWEB at the time of <br /> <br /> inspection will be billed to you. <br /> (Over) <br /> b_ ~bC~'')'00 ~ -7 <br /> T__ _ ~ ~ AUG 1 5 2006 <br /> <br />