<br /> City of Eugene
<br /> Contract Preliminary Progress Payment
<br /> Payment No 005 Pinal Pay
<br /> Contractor: MORSE BROS. Original Contract: $512,170.00
<br /> Job 93-004096 Current Amount: $516,816.00
<br /> Contract No: 2005-00023 Contract Award Date: 04/29/2005
<br /> PO 2005050446 Completion Date: 10/01/2005
<br /> Assessable: No
<br /> Current Contract Estimated Payment Cumulative Totals 9 Complete
<br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount
<br /> APT TAEINAY REHAB ALPHA (A3-A4), A4
<br /> 3eneral
<br /> 1000 Liquidated Damages ($500.00) DAY 0.000 $0.00 0.000 $0.00 0.000 $0.00 0.00
<br /> 0010 MOBILIZATION $25,650.00 LUMPSUM 1.000 $25,650.00 0.000 $0.00 1.000 $25,650.00 100.00
<br /> 0020 EROSION CONTROL $500.00 LUMPSUM 1.000 $500.00 0.000 $0.00 1.000 $500.00 100.00
<br /> 0030 Airport Safety & Security $20,000.00 LUMPSUM 1.000 $20,000.00 0.000 $0.00 1.000 $20,000.00 100.00
<br /> 0040 Temporary Striping $2.50 LINFT 1,315.000 $3,287.50 0.000 $0.00 2,075.000 $5,187.50 158.00
<br /> 0050 Remove Tie Downs or Ground Rod 001 $150.00 EACH 51.000 $7,650.00 0.000 $0.00 51.000 $7,650.00 100.00
<br /> 0060 Remove Light Pole/Foundation $800.00 EACH 1.000 $800.00 0.000 $0.00 -1.000 $800.00 100.00
<br /> 0070 Remove Catch Basin $1,200.00 EACH 1.000 $1,200.00 0.000 $0.00 1.000 $1,200.00 100.00
<br /> 0080 Sxcavatioa $16.00 CUYD 1,385.000 522,160.00 0.000 50.00 1,730.000 527,680.00 125.00
<br /> 0090 Geotext ile Pabric $1.00 SQYD 2,335.000 $2,335.00 0.000 $0.00 2,342.000 $2,392.00 100.00
<br /> 0100 Crushed Rock, 15" $11.00 SQYD 2,335.000 $25,685.00 0.000 $0.00 2,907.000 $31,977.00 124.00
<br /> 0110 Cold Plane Removal $1.85 SQYD 40,190.000 $74,351.50 0.000 $0.00 42,072.000 $77,833.20 M 105.00
<br /> 0120 AC, PRE-LEVEL $53.00 TON 50.000 $2,650.00 0.000 $0.00 42.000 $2,226.00 84.00
<br /> 0130 Bituminous Pavement 001 $34.65 TON 8,800.000 $304,920.00 383.780 $13,297.98 9,063.940 $314,065.52 M 103.00
<br /> 0140 VALLEY GITfTBR, REINF $31.00 LINFT 165.000 $5,115.00 0.000 $0.00 165.000 $5,115.00 100.00
<br /> 0150 10" CCP $72.00 LINFT 32.000 $2,304.00 0.000 $0.00 32.000 $2,304.00 100.00
<br /> 0160 Aircraft Rated Catch Basin $3,200.00 EACH 1.000 $3,200.00 0.000 $0.00 1.000 $3,200.00 100.00
<br /> 0170 Adjust 3tm Structures $650.00 BACA 3.000 $1,950.00 0.000 $0.00 7.000 54,550.00 233.00